Toronto, Ontario (FSCwire) - Mustang Minerals Corp. (TSX-V: MUM)
(“Mustang” or the “Company”) today announced that the resolution presented at the shareholders
meeting of March 9, 2018 to approve the name change of the Company was approved. The name change to Grid Metals Corp. will
reflect the unique property portfolio of Mustang that includes exposure to the key battery metals including nickel, copper,
lithium and cobalt. The key projects of the Company are all located in southeastern Manitoba in the Bird River Greenstone Belt.
The Company anticipates that the name change will be effected prior to mid April 2018.
Nickel Exploration Update
The ground electromagnetic (EM) geophysical study previously referenced by the Company has now commenced at the Makwa Nickel
Property following completion of linecutting. The program will consist of down hole surveying of several holes that
encountered significant nickel copper pgm intercepts (see press release dated January 29, 2018) as well as ground EM surveying
over a 3.1 kilometer portion of the Bird River sill to the east of the Makwa Nickel Deposit. The double loop configuration
being utilized is designed to assess the potential for mineralization to greater depths than would have been covered by previous
surveys at the property. Abititi Geophysics is the contractor completing the geophysical program.
The mineralization at Makwa is predominantly nickel but also contains significant platinum, palladium, copper and cobalt
credits. The Makwa Indicated resource grade (open pit) is 7.2 Mt grading 0.61% nickel, 0.13% copper, 0.10 g/t Pt and 0.36
g/t Pd. (per Mineral Resource Summary dated November 27, 2013). The following chart references several of the higher grade
drill holes drilled at approximately 200m downhole depth and greater at the Makwa open pit deposit. These type of grades and
higher constitute the exploration target of the current geophysical survey.
Illustrative Drill Holes - Makwa Nickel Deposit (drilled by Mustang Minerals)
|
From
Meters
|
To
Meters
|
Length
Meters
|
% Ni
|
% Cu
|
% Co
|
g/t Pt
|
g/t Pd
|
M04-11
|
199.9
|
207.9
|
7.9
|
1.283
|
0.148
|
0.036
|
0.261
|
1.232
|
M04-14
|
258.2
|
277.7
|
19.5
|
1.568
|
0.121
|
0.024
|
0.426
|
1.684
|
M04-18
|
220.1
|
255.8
|
35.7
|
1.144
|
0.136
|
0.023
|
0.231
|
1.068
|
Note: Horizontal (true) thickness M05-11- 4.8m; M04-14 - 9.4m; M04-18 - 11.2M
Source: February 18, 2004 Technical Report on the Maskwa Nickel Deposit Roscoe Postle Associates
Ltd.
About Mustang Minerals
Mustang owns the mineral rights to the Makwa Nickel-Copper-Cobalt Property and the Mayville Copper-Nickel Property both
located in the Bird River Greenstone Belt in southeast Manitoba. The Company completed a Preliminary Economic Assessment on the
Makwa-Mayville Project in 2014. The Company recently acquired lithium bearing pegmatites with a historic resource in the Mayville
area and also controls mineral rights at the East Bull Lake Property west of Sudbury prospective for PGM and the Bannockburn
Nickel Property near Matachewan Ontario.
Carey Galeschuk P. Geo is the Qualified Person for Mustang Minerals Corp.
To find out more about Mustang Minerals Corp. (TSX-V: MUM)
visit our website at www.mustangminerals.com or:
Telephone: 416-955-4773 email: info@mustangminerals.com
We seek safe harbour.
This news release contains forward-looking statements within the meaning of the United States Private
Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of the Securities Act (Ontario)
(together, “forward-looking statements”). Such forward-looking statements may include the Company’s plans for its mineral
projects in Manitoba, the overall economic potential of its properties, the availability of adequate financing and involve known
and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements expressed or
implied by such forward-looking statements to be materially different. Such factors include, among others, risks and
uncertainties relating to potential political risk, uncertainty of production and capital costs estimates and the potential for
unexpected costs and expenses, physical risks inherent in mining operations, currency fluctuations, fluctuations in the price of
nickel and other metals, completion of economic evaluations, changes in project parameters as plans continue to be refined, the
inability or failure to obtain adequate financing on a timely basis, and other risks and uncertainties, including those described
in the Company’s Management Discussion and Analysis for the most recent financial period and Material Change Reports filed with
the Canadian Securities Administrators and available at www.sedar.com.
Neither the TSX Venture Exchange nor it Regulations Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.
To view the original release, please click here
Source: Mustang Minerals Corp. (TSX Venture:MUM)
To follow Mustang Minerals Corp. on your favorite social media platform or financial websites, please click on the icons
below.
Maximum News Dissemination by FSCwire. https://www.fscwire.com
Copyright © 2018 FSCwire