TORONTO, July 09, 2018 (GLOBE NEWSWIRE) -- Troilus Gold Corp. (TSX-V:TLG) (“Troilus” or the “Company”) is
pleased to provide drilling results from its 100% owned Troilus gold and copper property located Northeast of the Val-d’Or district
in Quebec, Canada (the “Troilus Project”). The drill program is designed to confirm and expand existing mineral resources from the
historically producing Troilus mine, as well as explore down dip and along strike from known mineralization.
The first seven (7) holes drilled at the Troilus Project were designed to confirm the lower extent of gold and
copper results from historic drilling below the Z87 open pit and to develop a better understanding of mineralization and
lithological characteristics of the Troilus deposit to guide next phases of drilling (Fig 1&2).
Highlights:
- 1.63 grams per tonne gold (g/t Au) and 0.086 percent copper (% Cu) for 1.77 grams per tonne gold
equivalent (g/t AuEq) over 40 metres within a broader mineralized zone of 1.06 g/t AuEq over 88 metres, including 31.3 g/t AuEq
over 1m and 4.33 g/t AuEq over 4m within the Troilus Diorite in hole TLG-Z8718-007
- 1.13 grams per tonne gold (g/t Au) and 0.14 percent copper (% Cu) for 1.36 grams per tonne gold equivalent
(g/t AuEq) over 70 metres within a broader mineralized zone of 1.22 g/t AuEq over 90 metres, including 1.97 g/t AuEq over 6
metres, 3.93 g/t AuEq over 5 metres, and 2.53 g/t AuEq over 8 metres within the Troilus Diorite in hole
TLG-Z8718-005
“With the completion of our $15.8 million flow through equity offering our balance sheet is robust. Our
results continue to deliver to plan and show larger than expected envelopes of mineralization at Z87. Based on these results
and our logging of over 50+ completed holes we are expanding our Phase 1 program by an additional 5,000 meters. We have worked
through the bottlenecks in the labs and are now seeing a rapid return of samples. We look forward to updating our shareholders
as soon as possible.”
There are presently two drills operating at the Troilus Project, having completed approximately 30,000 metres
from over 70 diamond drill holes. Drilling below the J4 historic open pit to show, down dip expansion has been expanded and is
currently ongoing. Troilus’s Phase 1, 30,000 metre drill program is being expanded to 35,000 metre.
Drilling at depth below historic open pit Z87, and into/below known historic resource estimates has been
completed. Sampling from over 55 holes have been sent to the laboratory for assaying. Assay results from deep drilling are in the
process of coming in and will be reported in due course.
|
|
From
(m) |
To
(m) |
Length
(m) |
Au
g/t |
Cu
% |
AuEq
g/t |
TLG-Z8718-005 |
|
439 |
529 |
90 |
1.02 |
0.12 |
1.22 |
|
incl |
458 |
464 |
6 |
1.57 |
0.25 |
1.97 |
|
incl |
472 |
477 |
5 |
3.03 |
0.57 |
3.93 |
|
incl |
520 |
528 |
8 |
2.36 |
0.11 |
2.53 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TLG-Z8718-007 |
|
432 |
520 |
88 |
0.93 |
0.08 |
1.06 |
|
incl |
476 |
477 |
1 |
31.27 |
0.02 |
31.3 |
|
incl |
503 |
507 |
4 |
3.55 |
0.49 |
4.33 |
*Metal grades uncut
**AuEq based on $1300/oz Au, $3/lb Cu and 100% recovery. Au g/t + ( Cu g/t * Cu price (g))/Au price (g)
Figure 1: Plan view of initial seven holes at Z87 to confirm gold/ copper historic results and
focus lithology
http://www.globenewswire.com/NewsRoom/AttachmentNg/89ac08d2-84ed-436d-8b04-4e83d2ee1904
Figure 2: Drillhole sections looking North East of drilling results from holes TLG-Z8718-005
and 007.
Figure 2a: Drillhole sections looking Northeast TLG-Z8718-005 (200 metre scale spacing)
http://www.globenewswire.com/NewsRoom/AttachmentNg/328f9ffc-ca65-451d-bc37-8746dee5e03e
Figure 2b: Drillhole sections looking Northeast TLG-Z8718-005 (20 metre scale spacing)
http://www.globenewswire.com/NewsRoom/AttachmentNg/bda8cf8c-f248-421b-9c7f-a5d5b390ca49
Figure 2c: Drillhole sections looking Northeast TLG-Z8718-007 (200 metre scale spacing)
http://www.globenewswire.com/NewsRoom/AttachmentNg/5f051b41-75fa-438d-aa0b-225eafa18803
Figure 2d: Drillhole sections looking Northeast TLG-Z8718-007 (20 metre scale spacing)
http://www.globenewswire.com/NewsRoom/AttachmentNg/9c5d2f5d-183a-4f5a-bf2e-af77c0363b9b
30,000 Metre Winter/ Spring Drill Program
Overview:
- Zone 87 (Z87): Expand defined underground estimated mineral resource down dip and along strike below the
historic producing Z87 open pit.
- Zone J4 (J4) & Zone J5 (J5) : Expand estimated mineral resource below historic producing J4 and J5 open pits
to show potential near surface mineralization.
- Southwest Zone: Based on historic drilling success, initiate near surface exploration 3.5 km southwest of
Z87 open pit along the Troilus Diorite boundary (Figure 2)
1) Z87:
From 1996 to 2010, Z87 produced the majority of the over 2 million ounces of gold and 70,000 tonnes of copper
produced at the Troilus Project. The Z87 pit was ultimately 350 metres deep and had a strike of approximately 900 metres. The Z87
zone is the focus of the current underground estimated mineral resource, representing over 1.6 million ounces of indicated and
360,000 ounces of inferred material (Figure 5).
Mineralization at the Troilus Project is hosted in breccias and amphibolite grade metamorphic rocks within a
much broader, 4.5 kilometre by 400 metre, metamorphosed diorite, known as the Troilus Diorite. Fine-grained disseminated gold
accounts for approximately 90% of mineralization at Troilus, primarily as native gold and electrum with grains as large as 20
microns. Chalcopyrite, Pyrite, and Pyrrhotite are broadly disseminated throughout the ore body, which are rarely associated with
gold (<1-3%). Vein-hosted gold accounts for approximately 10% of mineralization which are responsible for high-grade intercepts
(>50gpt over 1 m) at Troilus.
The broad geology and style of mineralization at Z87 creates a large deposit area, nearly 1 kilometre along
strike and 30-50 metres wide, which remains open both along strike and down dip. The 2018 Winter/ Spring drill program at Z87 is
designed to:
- Expand and infill certain areas of Troilus’ existing underground estimated mineral resource;
- Convert and upgrade inferred material along the flanks and down dip extension of underground estimated mineral resources to
an indicated category; and
- Expand down dip estimated mineral resources and show potential for further expansion through focused infill and stepout
drilling.
Figure 3: Z87, J4 and J5 Mineral Resource Constraining Shells. View Looking Northeast
http://www.globenewswire.com/NewsRoom/AttachmentNg/50a03935-35ce-482d-b97c-ace03b9312a0
2) Zones J4 & J5:
J4 and J5, two smaller scale historic open pits located 200 metres and 1 kilometre directly Northeast of Z87 are
characterized by the same mineralization and geology as Z87; both remaining open at depth and along strike.
Management believes the inherited Troilus database suggests the potential for additional near surface
mineralization at J4 and J5 and potentially signifies open pittable resource opportunities. The objective of the current drill
campaign, at J4 and J5, is to expand the open pit and underground estimated mineral resource below these lesser historic pits, with
the intent of recognizing material that could contribute to an early production scenario.
3) Southwest Zone
The Southwest Zone is located along the margin of the Troilus Diorite and surrounding volcanics, 3.5 kilometres
Southwest of Z87 (Figure 4). Historically this area exhibited significant mineralization from drilling including intercepts as high
as 36m @ 1.23g/t Au, and 18m @ 1.06g/t Au. Historic drilling in this area is limited, leaving the opportunity to explore, and
potentially outline new mineralization at surface.
The Southwest Zone exemplifies near term, blue sky opportunity at Troilus, and will be the initial focus of a
significant, property wide exploration program. The Troilus Diorite remains underexplored and highly prospective.
Figure 4: Troilus Project Geology and Target Map
http://www.globenewswire.com/NewsRoom/AttachmentNg/cbe46b3e-44b5-4910-ad75-6e25258a7c73
Figure 5: Troilus Estimated Underground Resource
http://www.globenewswire.com/NewsRoom/AttachmentNg/4b71a164-5764-400d-92ce-cb047f6b3c49
Quality Control
During the drill program, one metre assay samples are taken from NQ core and sawed in half. One-half is sent for
assaying at AGAT Laboratory, a certified commercial laboratory, and the other half is retained for results, cross checks, and
future reference. A strict QA/QC program is applied to all samples; which include insertion of one certified mineralized standard
and one blank sample in each batch of 25 samples. The gold analyses were by fire-assay on 30 grams of pulp with an atomic
absorption finish. Repeats were carried out by fire-assay with a gravimetric finish on each sample containing 3.5 g/t Au or
more.
About Troilus Gold Corp.
Troilus Gold is a Toronto-based, Quebec focused, advanced stage exploration and early-development company
focused on the mineral expansion and potential mine re-start of the former gold and copper Troilus mine. The 4,700-hectare Troilus
property is located Northeast of the Val-d’Or district, within the Frotêt-Evans Greenstone Belt in Quebec, Canada. From 1997 to
2010, Inmet Mining Corporation operated the Troilus project as an open‐pit mine, producing more than 2,000,000 ounces of gold and
nearly 70,000 tonnes of copper.
Qualified Person
The technical and scientific information in this press release has been reviewed and approved by Bruno Perron, P.Eng., Senior
Technical Manager, who is a Qualified Person as defined by National Instrument 43-101. Mr. Perron is an employee of Troilus and is
not independent of the Company under National Instrument 43-101
For more information:
Spyros Karellas
Communications Manager
+1 (416) 433-5696
skarellas@troilusgold.com
Cautionary statements
Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no
certainty that all or any part of Mineral Resources will be converted to Mineral Reserves. Inferred Mineral Resources have a
lower level of confidence that that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve.
Quantity and grades are estimates and are rounded to reflect the fact that the Mineral Resource Estimate is an approximation.
For more information with respect to the key assumptions, parameters and risks associated with the mineral resource estimates
discussed herein, see the Company’s technical report entitled “Technical Report on the Troilus Gold Copper Mine Mineral Resource
Estimate, Quebec, Canada” dated November 20, 2017 (the “Technical Report”) available under the Company’s profile at
www.sedar.com.
This press release contains “forward‑looking information” within the meaning of applicable Canadian
securities legislation. Forward‑looking information includes, but is not limited to, statements regarding , the impact of drill
results and mineral resources estimate on the Company, the projected economics of the project, and the Company’s understanding of
the project; statements with respect to the development potential and timetable of the project; the estimation of mineral
resources; potential upgrades and/or expansion of the mineral resources; realization of mineral resource estimates; the timing and
amount of estimated future exploration; costs of future activities; capital and operating expenditures; success of exploration
activities; government regulation of mining operations; and environmental risks and the receipt of any required regulatory
approvals. Generally, forward‑looking information can be identified by the use of forward-looking terminology such as “plans”,
“expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does
not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results
“may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. Forward‑looking information is subject to
known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or
achievements of Troilus to be materially different from those expressed or implied by such forward‑looking information, including
but not limited to: there being no assurance that the exploration program will result in expanded mineral resources;
;risks and uncertainties inherent to mineral resource estimates; receipt of necessary approvals; general business, economic,
competitive, political and social uncertainties; future prices of mineral prices; accidents, labour disputes and shortages;
environmental and other risks of the mining industry, including without limitation, risks and uncertainties discussed in
the Technical Report and other continuous disclosure documents of the Company available under the Company’s profile at
www.sedar.com . Although Troilus has attempted to identify important factors that could cause actual results to differ materially
from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated,
estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on
forward‑looking information. Pitchblack and Troilus do not undertake to update any forward-looking information, except in
accordance with applicable securities laws.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.