TSX: JAG
TORONTO, Feb. 27, 2019 /CNW/ - Jaguar Mining Inc. ("Jaguar" or
the "Company") (TSX: JAG) today announced drilling results from 19 holes over 4,523m as part of its
growth exploration drill program on Orebody C, and 46 holes over 4,708m from infill drilling (39
holes at C-SE and 7 holes at C-Central) completed since June 2018 (Refer News Release February 26 and June 18, 2018) at Turmalina Gold Mine ("Turmalina"). The growth
drilling focused on targeting Orebody C extensions down plunge and laterally along strike, and to upgrade mineral resources to
mineral reserves.
Turmalina Exploration Highlights
- Drill results confirm the structure hosting Orebody C extends to depth beyond mine level 8,500m down plunge (400m vertically) from current operations and remains open
at depth
- Drill results confirm changes in the plunge direction of the higher-grade ore shoot as mapped structurally in mine
development on levels 3 and 4 in Q3 2018
- 4 growth exploration holes intersected grade x thickness of > 10 GM including an intercept of 7.08 g/t Au over
3.85m (ETW 3.2m)
- Completed infill drilling on Orebody C to upgrade and covert mineral resources to mineral reserves between levels 3 and 5
- Key infill drilling intersections on Orebody C-SE include 5.76 g/t Au over 29.63m (ETW
22.69m), 6.40 g/t Au over 14.80m (ETW 12.56m) and 5.65 g/t Au over 26.54m (ETW 19.09m)
- Infill drilling continued to define wide; high-grade intercepts in 19 intersections with a grade x thickness of > 10 GM
including 15 intersections with grade x thickness > 25 GM, 5 intersections with grade x thickness > 50 GM and 3
intersections with grade x thickness > 100 GM
- 8 infill holes targeting Orebody C-Central based on the new plunge interpretation include two higher grade intersections
from the drilling in this area completed to date of 18.35 g/t Au over 8.76m (ETW 8.23m) and 9.95g/t Au over 2.29m (ETW 2.0m). Intersections appear to define a high-grade plunging mineralized shoot, which extends over a
strike length of approximately 50m
Definitions: ETW – estimated true width, g/t Au – grams per tonne gold, m – metres, Grade (g/t Au) x Thickness (m) = GM
(gram – meters)
Ben Guenther Interim CEO, Jaguar Mining commented: "We continue to improve our geological understanding of Orebody C through
structural mapping, targeted growth drilling and prioritized infill drilling. This strategic approach enables us to plan and
develop shallow mineralization that will provide Turmalina with additional ore faces and operational flexibility. Development of
C Central will also provide exploration platforms for C NW and extend the orebody laterally to increase longer term production
capability. We look forward to reporting our update Mineral Resources and Mineral Reserves during March 2019."
Jon Hill, Expert Advisor, Geology and Exploration, Jaguar Mining Management Committee
commented: "During 2018 exploration programs focused on upgrading mineral resources to mineral reserves on both principle
orebodies at Turmalina. Concurrently, the Company has significantly advanced the understanding of the structural and related
geological controls on Orebody C mineralization through detailed geological mapping of current and ongoing underground
development. The recognition of a new plunge control to the distribution of the higher grade and wider mineralized zones clearly
broadens the potential to find additional higher-grade mineralized "pay shoots" at shallower depths along the strike of the host
structure and, more significantly, depth extensions, down plunge from the C-Central and C-NW historically mined open pits."
"The recent high-grade intercept on orebody C-Central with a grade x thickness value > 150 GM is encouraging as we begin to
evaluate previously under-tested areas assuming the newly identified plunge control. This work is being prioritized as any
increase in grade, tonnes and ounces per vertical meter added in shallow areas of the mine may leverage access from existing
infrastructure and provide more flexibility in the mine plan and ultimately potential for higher production".
Turmalina Orebody C Growth Exploration and Infill Drilling Results
Growth exploration drilling, targeting down dip extensions from level 4, continues to confirm the structure hosting Orebody C
extends to depth beyond mine level 8 approximately 500m down plunge and 400m vertically from current operations. Importantly, this drilling successfully tested and confirmed the
changes in the plunge direction of the higher-grade ore shoot highlighted by earlier drilling and subsequently geologically –
structurally mapped in the mine development on levels 3 and 4 in Q3-2018 (Refer June 18, 2018 news
release).
The new plunge direction assumed is N75/48 (azimuth / dip) (previous N45/55). This high-grade plunge direction approximates
the observed Orebody A high-grade zone plunge of N65/48.
Further drilling is planned for Q2 and Q3 2019 to fully test this ore-shoot between level 4 and level 8 once a new drilling
platform has been prepared for this purpose from the C-ramp on level 5. (Refer figure 2).
Infill drilling on Orebody C focusing on upgrading mineral resources to mineral reserves between levels 3 and 5 was
prioritized in Q3 and Q4 to inform the Mineral Resources and Mineral Reserves update during March
2019.
This infill drilling continued to define wide; high-grade intercepts consistent with those previously reported (Refer news
releases dated June18, 2018 and February 26, 2018). In the results released today 19 intersections
with a grade x thickness of > 10 GM including 15 intersections with grade x thickness > 25 GM, 5 intersections with grade x
thickness > 50 GM and 3 intersections with grade x thickness > 100 GM. (Refer figure 3, table 2).
The observed change in the plunge control of the higher grade and wider parts of the Orebody Host Structure has positive
implications for interpreting and targeting additional shallow mineralization further along the strike of the Orebody C structure
where clear potential exists for the identification and delineation of additional high grade shoots below the C-Central and C-NW
open pits.
Results are reported from 8 infill holes targeting Orebody C-Central along strike from Orebody C-SE (using the mine drill rig)
drilled as part of an ongoing drilling programme testing the potential for additional shallow, structurally controlled
"payshoots" associated with the new plunge interpretation. Two higher grade intersections are reported from this drilling
completed to date; 18.35 g/t Au over 8.76m (ETW 8.23m) and 9.95g/t Au
over 2.29m (ETW 2.0m). These two holes define a high-grade plunging
mineralized shoot, which extends over a strike length currently estimated to be of the order of 50m
in this area.
Further drilling and evaluation work targeting Orebodies C - Central and C-NW is in progress with the aim of identifying and
delineating mineable material close to existing development that is currently within 150m on
Orebody C-SE level 4. (Refer figure 4 and table 2).
Of Note, results and data from 18 infill drill holes out of the 46 infill drill hole results included in this report were
drilled after the database closed for the estimation at the end of 2018 Mineral Resources and Mineral Reserves. The hole numbers
and coordinate data for these 18 holes are included in Appendix 2.
Turmalina Gold Mine Drill Results and Intercepts
Table 1. Growth Exploration Drilling Results Orebody C. (OREBODY – CSE)
Turmalina Gold Mine
Growth Exploration Drill Results Ore Body C
|
Hole ID
|
From
|
To
|
Down Hole
Interval (m)
|
Estimated True
Width (m)
|
Gold Grade
(g/t)
|
GT
(ETW)
|
FTS1489
|
183.00
|
186.15
|
3.15
|
2.34
|
4.66
|
10.90
|
FTS1553
|
93.95
|
95.05
|
1.10
|
0.90
|
1.79
|
1.61
|
FTS1555
|
176.00
|
177.90
|
1.90
|
1.70
|
1.27
|
2.16
|
FTS1558
|
256.80
|
257.70
|
0.90
|
0.87
|
3.32
|
2.89
|
335.30
|
336.30
|
1.00
|
0.97
|
2.73
|
2.65
|
FTS1559
|
191.00
|
193.05
|
2.05
|
1.98
|
2.90
|
5.74
|
FTS1560
|
154.30
|
155.30
|
1.00
|
0.85
|
1.82
|
1.55
|
FTS1561
|
222.35
|
224.35
|
2.00
|
1.90
|
5.24
|
9.96
|
FTS1562
|
186.45
|
187.45
|
1.00
|
0.89
|
1.50
|
1.34
|
FTS1563
|
120.45
|
121.45
|
1.00
|
0.90
|
1.23
|
1.11
|
FTS1564
|
208.35
|
209.35
|
1.00
|
0.90
|
1.29
|
1.16
|
FTS1565
|
109.30
|
110.45
|
1.15
|
0.95
|
1.12
|
1.06
|
FTS1566
|
No impact
|
FTS1567
|
138.50
|
139.50
|
1.00
|
0.92
|
3.68
|
3.39
|
FTS1568
|
148.85
|
151.75
|
2.90
|
2.68
|
4.17
|
11.18
|
FTS1569
|
101.10
|
103.05
|
1.95
|
1.83
|
1.94
|
3.55
|
165.60
|
169.65
|
4.05
|
3.78
|
2.44
|
9.22
|
FTS1646
|
184.95
|
188.80
|
3.85
|
3.20
|
7.08
|
22.66
|
FTS1647
|
195.85
|
198.15
|
2.30
|
1.88
|
1.55
|
2.91
|
FTS1668
|
174.40
|
180.60
|
6.20
|
5.82
|
2.76
|
16.06
|
FTS1678
|
186.90
|
189.95
|
3.05
|
2.86
|
1.55
|
4.43
|

Table 2. Infill Drilling Results Orebody C – Turmalina
Please note assay results reported in the tabulation below were analyzed at Jaguar's Caeté Laboratory.
Turmalina Gold Mine
Infill Drill Results Ore Body C
|
Hole ID
|
From
|
To
|
Down hole
Interval (m)
|
Estimated True
Width (m)
|
Gold Grade
(g/t)
|
GT
(ETW)
|
Drilling
Company
|
FTS1537
|
No impact
|
JAGUAR
|
FTS1544*
|
65.20
|
72.38
|
7.18
|
6.99
|
2.78
|
19.43
|
JAGUAR
|
FTS1545*
|
74.95
|
79.10
|
4.15
|
3.75
|
7.57
|
28.39
|
JAGUAR
|
FTS1546*
|
67.70
|
69.80
|
2.10
|
1.80
|
4.44
|
7.99
|
JAGUAR
|
FTS1547A*
|
80.41
|
83.60
|
3.19
|
2.76
|
2.96
|
8.17
|
JAGUAR
|
FTS1574
|
82.54
|
85.44
|
2.90
|
2.58
|
2.80
|
7.22
|
JAGUAR
|
107.67
|
114.48
|
6.81
|
6.06
|
2.62
|
15.88
|
JAGUAR
|
FTS1627
|
77.79
|
80.42
|
2.63
|
2.58
|
3.55
|
9.16
|
JAGUAR
|
102.91
|
105.06
|
2.15
|
2.11
|
3.45
|
7.28
|
JAGUAR
|
FTS1628A
|
57.00
|
59.00
|
2.00
|
1.73
|
9.23
|
15.97
|
JAGUAR
|
73.00
|
75.00
|
2.00
|
1.63
|
5.13
|
8.36
|
JAGUAR
|
78.00
|
89.85
|
11.85
|
9.70
|
2.07
|
20.08
|
JAGUAR
|
94.60
|
96.00
|
1.40
|
1.23
|
4.73
|
5.82
|
JAGUAR
|
FTS1629
|
66.00
|
76.00
|
10.00
|
7.00
|
3.78
|
26.46
|
JAGUAR
|
82.00
|
88.00
|
6.00
|
4.24
|
8.41
|
35.66
|
JAGUAR
|
FTS1630
|
66.30
|
84.77
|
18.47
|
17.50
|
3.81
|
66.68
|
JAGUAR
|
FTS1631
|
56.73
|
73.00
|
16.27
|
14.95
|
3.82
|
57.11
|
JAGUAR
|
FTS1632
|
69.22
|
70.22
|
1.00
|
0.90
|
3.07
|
2.76
|
JAGUAR
|
FTS1649
|
21.80
|
35.03
|
13.23
|
11.45
|
1.72
|
19.69
|
JAGUAR
|
FTS1650
|
20.00
|
22.10
|
2.10
|
1.43
|
1.43
|
2.04
|
JAGUAR
|
27.35
|
29.39
|
2.04
|
1.76
|
2.50
|
4.40
|
JAGUAR
|
FTS1651
|
22.10
|
45.09
|
22.99
|
18.83
|
2.35
|
44.25
|
JAGUAR
|
FTS1652
|
29.34
|
58.97
|
29.63
|
22.69
|
5.76
|
130.69
|
JAGUAR
|
FTS1659
|
37.13
|
39.15
|
2.02
|
1.98
|
3.13
|
6.20
|
JAGUAR
|
42.23
|
43.27
|
1.04
|
1.02
|
4.68
|
4.77
|
JAGUAR
|
FTS1660
|
26.30
|
40.67
|
14.37
|
9.98
|
4.63
|
46.21
|
JAGUAR
|
FTS1661
|
20.70
|
33.67
|
12.97
|
9.17
|
1.61
|
14.76
|
JAGUAR
|
44.70
|
47.99
|
3.29
|
2.52
|
3.39
|
8.54
|
JAGUAR
|
FTS1662
|
32.82
|
50.72
|
17.90
|
15.65
|
5.03
|
78.72
|
JAGUAR
|
FTS1663
|
39.22
|
54.02
|
14.80
|
12.56
|
6.40
|
80.38
|
JAGUAR
|
59.68
|
68.07
|
8.39
|
7.03
|
2.72
|
19.12
|
JAGUAR
|
FTS1664
|
49.91
|
58.59
|
8.68
|
6.24
|
5.32
|
33.20
|
JAGUAR
|
63.22
|
76.45
|
13.23
|
9.51
|
7.79
|
74.08
|
JAGUAR
|
49.91
|
76.45
|
26.54
|
19.09
|
5.65
|
107.86
|
JAGUAR
|
FTS1682
|
48.28
|
52.08
|
3.80
|
2.95
|
1.23
|
3.63
|
JAGUAR
|
FTS1683
|
56.88
|
72.00
|
15.12
|
11.91
|
2.49
|
29.66
|
JAGUAR
|
78.94
|
79.63
|
0.69
|
0.54
|
20.35
|
10.99
|
JAGUAR
|
FTS1684
|
46.85
|
60.41
|
13.56
|
10.97
|
3.75
|
41.14
|
JAGUAR
|
65.83
|
68.61
|
2.78
|
2.19
|
8.42
|
18.44
|
JAGUAR
|
FTS1685
|
49.32
|
64.34
|
15.02
|
13.26
|
2.42
|
32.09
|
JAGUAR
|
FTS1686
|
54.10
|
58.01
|
3.91
|
3.51
|
4.56
|
16.01
|
JAGUAR
|
FTS1687
|
No impact
|
JAGUAR
|
FTS1688
|
43.32
|
46.17
|
2.85
|
2.77
|
2.09
|
5.79
|
JAGUAR
|
FTS1690*
|
66.90
|
74.85
|
7.95
|
7.20
|
2.00
|
14.40
|
JAGUAR
|
105.70
|
114.46
|
8.76
|
8.23
|
18.35
|
151.02
|
JAGUAR
|
FTS1691*
|
60.81
|
61.67
|
0.86
|
0.79
|
1.66
|
1.31
|
JAGUAR
|
81.38
|
82.36
|
0.98
|
0.83
|
1.51
|
1.25
|
JAGUAR
|
99.65
|
100.60
|
0.95
|
0.86
|
1.09
|
0.94
|
JAGUAR
|
FTS1692*
|
137.00
|
139.29
|
2.29
|
2.00
|
9.95
|
19.90
|
JAGUAR
|
FTS1693*
|
123.44
|
124.31
|
0.87
|
0.71
|
4.13
|
2.93
|
JAGUAR
|
FTS1717
|
100.18
|
102.20
|
2.02
|
1.90
|
6.20
|
11.78
|
JAGUAR
|
FTS1671
|
101.00
|
108.30
|
7.30
|
6.32
|
4.07
|
25.72
|
MAJOR
|
FTS1672
|
49.91
|
58.59
|
8.68
|
6.24
|
5.32
|
33.20
|
MAJOR
|
FTS1673
|
80.60
|
88.85
|
8.25
|
8.00
|
5.25
|
42.00
|
MAJOR
|
FTS1674
|
62.50
|
65.00
|
2.50
|
1.05
|
10.95
|
11.50
|
MAJOR
|
88.45
|
92.50
|
4.05
|
2.02
|
3.60
|
7.27
|
MAJOR
|
FTS1675
|
112.00
|
113.00
|
1.00
|
0.76
|
10.01
|
7.61
|
MAJOR
|
FTS1676
|
88.00
|
98.00
|
10.00
|
9.06
|
1.63
|
14.77
|
MAJOR
|
104.60
|
110.50
|
5.90
|
5.34
|
3.34
|
17.84
|
MAJOR
|
FTS1677
|
82.67
|
88.14
|
5.47
|
4.91
|
2.81
|
13.80
|
MAJOR
|
95.70
|
98.59
|
2.89
|
2.45
|
6.31
|
15.46
|
MAJOR
|
FTS1706
|
78.00
|
91.00
|
13.00
|
12.05
|
3.94
|
47.48
|
MAJOR
|
FTS1707
|
62.75
|
65.00
|
2.25
|
2.11
|
2.22
|
4.68
|
MAJOR
|
89.30
|
91.60
|
2.30
|
2.16
|
13.13
|
28.36
|
MAJOR
|
FTS1708
|
95.65
|
96.65
|
1.00
|
0.85
|
7.76
|
6.59
|
MAJOR
|
FTS1709
|
109.60
|
111.75
|
2.15
|
1.90
|
8.70
|
16.53
|
MAJOR
|
FTS1711
|
84.00
|
94.80
|
10.80
|
8.50
|
5.73
|
48.71
|
MAJOR
|
* Infill Drilling Results Orebody C - CENTRAL
Qualified Person
Scientific and technical information contained in this press release has been reviewed and approved by Jonathan Victor Hill, BSc (Hons) (Economic Geology - UCT), FAUSIMM, Senior Expert Advisor Geology and
Exploration to the Jaguar Mining Management Committee, who is also an employee of Jaguar Mining Inc., and is a "qualified person"
as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").
Quality Control
Jaguar continues to use a quality-control program that includes insertion of blanks and commercial standards in order to
ensure best practice in sampling and analysis.
HQ, NQ, and BQ size drill core is sawn in half with a diamond saw. Samples are selected for analysis in standard intervals
according to geological characteristics such as lithology and hydrothermal alteration. All diamond drill hole collars are
accurately surveyed using a Total Station instrument and down-hole deviations are surveyed using non-magnetic equipment (SPT
Stockholm Precision Tools with GyroMaster™ Solid State North Seeker) and a Reflex Gyrosmart 642.
Mean grades are calculated using a variable lower grade cut-off (generally 0.5g/t Au). No upper gold grade cut has been
applied to the data. However, the requirement for assay top cutting will be assessed during future resource work.
Half of the sawed sample is forwarded to the analytical laboratory for analysis while the remaining half of the core is stored
in a secure location. The drill core samples from growth exploration drillholes are transported in securely sealed bags and sent
for physical preparation to the independent ALS Brazil (subsidiary of ALS Global) laboratory located in Vespasiano, Minas Gerais,
Brazil. The analysis is conducted at ALS Global's respective facilities (fire assay are
conducted by ALS Global in Lima, Peru, and multi-elementary analysis are conducted by ALS Global
in Vancouver, Canada). ALS has accreditation in a global management system that meets all
requirements of international standards ISO/IEC 17025:2005 and ISO 9001:2015. All major ALS geochemistry analytical laboratories
are accredited to ISO/IEC 17025:2005 for specific analytical procedures.
The infill drilling results presented on this news release are from drill holes completed by both Major Drilling on contract and Jaguar Mining Inc´s own drilling machines. The infill samples are transported
for physical preparation and analysis in securely sealed bags to the Jaguar in-house laboratory located at the Roça Grande Mine,
Caeté, Minas Gerais.
For a complete description of Jaguar's sample preparation, analytical methods and QA/QC procedures, please refer to the
"Technical Report on the Roça Grande and Pilar Operations, Minas Gerais State, Brazil", a
copy of which is available on the Company's SEDAR profile at www.sedar.com.
The Iron Quadrangle
The Iron Quadrangle has been an area of mineral exploration dating back to the 16th century. The discovery in 1699–1701 of
gold contaminated with iron and platinum-group metals in the southeastern corner of the Iron Quadrangle gave rise to the name of
the town Ouro Preto (Black Gold). The Iron Quadrangle contains world-class multi-million-ounce
gold deposits such as Morro Velho, Cuiabá, and São Bento. Jaguar holds the second largest gold land position of a gold producer
in the Iron Quadrangle with just over 25,000 hectares.
About Jaguar Mining Inc.
Jaguar Mining Inc. is a Canadian-listed junior gold mining, development, and exploration company operating in Brazil with three gold mining complexes and a large land package with significant upside exploration
potential from mineral claims covering an area of approximately 64,000 hectares. The Company's principal operating assets are
located in the Iron Quadrangle, a prolific greenstone belt in the state of Minas Gerais and include the Turmalina Gold Mine
Complex and Caeté Mining Complex (Pilar and Roça Grande Mines, and Caeté Plant). The Company also
owns the Paciência Gold Mine Complex, which has been on care and maintenance since 2012. The Roça Grande Mine has been on
temporary care and maintenance since April 2018. Additional information is available on the
Company's website at www.jaguarmining.com.
Forward-Looking Statements
Certain statements in this news release constitute "forward-looking information" within the meaning of applicable Canadian
securities legislation. Forward-looking statements and information are provided for the purpose of providing information about
management's expectations and plans relating to the future. All of the forward-looking information set forth in this news release
is qualified by the cautionary statements below and those made in our other filings with the securities regulators in
Canada. Forward-looking information contained in forward-looking statements can be identified by
the use of words such as "are expected", "is forecast", "is targeted," "approximately," "plans," "anticipates," "projects,"
"continue," "estimate," "believe," or variations of such words and phrases or statements that certain actions, events or results
"may," "could," "would," "might," or "will" be taken, occur or be achieved. All statements, other than statements of historical
fact, may be considered to be or include forward-looking information. These forward-looking statements are made as of the date of
this news release and the dates of technical reports, as applicable. This news release contains forward-looking information
regarding potential and, among other things, expected future mineral resources, potential mineral production opportunities,
geological and mineral exploration statistics, ore grades, current and expected future assay results, and
definition/delineation/exploration drilling at the Pilar Gold Mine and the Turmalina Gold Mine in Brazil, as well as forward-looking information regarding costs of production, capital expenditures, costs
and timing of the development of projects and new deposits, success of exploration, development and mining activities, capital
requirements, project studies, mine life extensions, and continuous improvement initiatives. The Company has made numerous
assumptions with respect to forward-looking information contained herein, including, among other things, assumptions about the
estimated timeline and for the development of the drill program at the Pilar Gold Mine (and its expanded exploration footprint)
and the Turmalina Gold Mine; its mineral properties; the supply and demand for, and the level and volatility of the price of,
gold; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based;
the receipt of necessary permits; market competition; ongoing relations with employees and impacted communities; and political
and legal developments in any jurisdiction in which the Company operates being consistent with its current expectations
including, without limitation, the impact of any potential power rationing, tailings facility regulation, exploration and mine
operating licenses and permits being obtained and renewed and/or there being adverse amendments to mining or other laws in
Brazil and any changes to general business and economic conditions. Forward-looking information
involves a number of known and unknown risks and uncertainties, including among others: the risk of Jaguar not meeting its plans
regarding its operations and financial performance; uncertainties with respect to the price of gold, labor disruptions,
mechanical failures, increase in costs, environmental compliance and change in environmental legislation and regulation, weather
delays and increased costs or production delays due to natural disasters, power disruptions, procurement and delivery of parts
and supplies to the operations; uncertainties inherent to capital markets in general (including the sometimes volatile valuation
of securities and an uncertain ability to raise new capital) and other risks inherent to the gold exploration, development and
production industry, which, if incorrect, may cause actual results to differ materially from those anticipated by the Company and
described herein. In addition, there are risks and hazards associated with the business of gold exploration, development, mining
and production, including without limitation environmental hazards, tailings dam failures, industrial accidents and workplace
safety problems, unusual or unexpected geological formations, pressures, cave-ins, flooding, chemical spills, and gold bullion
thefts and losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Although we
have attempted to identify important factors that could cause actual actions, events or results to differ materially from those
described in forward-looking statements, there may be other factors that cause actions, events or results not to be as
anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as
actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should
not place undue reliance on forward-looking information.
Appendix 1
Drill Hole location data for holes reported in this Press-Release - Orebody C Growth Exploration Drilling.
Hole ID
|
Easting
(m)
|
Northing
(m)
|
Elevation
(m)
|
Total
Depth
(m)
|
Collar
Azimuth
(°)
|
Collar
Dip (°)
|
Date
|
Orebody
|
Drilling
Company
|
Technical
Report-
2019
|
FTS1489
|
513131.08
|
7817115.40
|
340.1
|
230.65
|
247.92
|
-51.17
|
9/5/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1553
|
513300.41
|
7817178.30
|
64.35
|
180.10
|
229.35
|
-34.32
|
7/3/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1555
|
513131.92
|
7817115.11
|
340.26
|
248.75
|
224.94
|
-70.27
|
17/05/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1558
|
513299.24
|
7817179.45
|
65.62
|
337.30
|
261.19
|
11.57
|
25/06/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1559
|
513301.02
|
7817180.56
|
63.59
|
271.50
|
295.06
|
-76.84
|
31/07/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1560
|
513300.02
|
7817179.61
|
63.53
|
201.65
|
265.86
|
-45.48
|
7/8/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1561
|
513299.76
|
7817179.92
|
64.62
|
253.95
|
270.98
|
-10.51
|
29/06/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1562
|
513300.49
|
7817180.39
|
63.72
|
284.90
|
285.17
|
-64.49
|
18/10/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1563
|
513301.00
|
7817180.76
|
63.69
|
263.80
|
301.44
|
-67.50
|
18/10/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1564
|
513301.57
|
7817181.16
|
63.48
|
330.15
|
324.08
|
-78.53
|
24/08/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1565
|
513300.45
|
7817180.19
|
63.64
|
227.55
|
278.64
|
-54.83
|
17/09/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1566
|
513300.72
|
7817180.64
|
63.74
|
270.00
|
293.83
|
-56.44
|
19/09/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1567
|
513300.79
|
7817177.40
|
64.17
|
164.85
|
214.09
|
-20.79
|
5/9/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1568
|
513301.27
|
7817176.97
|
64.15
|
171.10
|
201.08
|
-18.82
|
6/9/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1569
|
513301.85
|
7817176.12
|
63.97
|
195.20
|
188.00
|
-17.82
|
13/09/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1646
|
513301.71
|
7817176.12
|
64.14
|
204.90
|
180.02
|
-16.42
|
26/09/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1647
|
513302.35
|
7817175.89
|
64.14
|
247.05
|
172.71
|
-12.36
|
17/10/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1668
|
513302.38
|
7817176.71
|
63.52
|
207.50
|
168.87
|
-36.20
|
23/10/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1678
|
513301.15
|
7817176.61
|
64.84
|
232.35
|
192.36
|
-2.13
|
25/10/2018
|
Corpo CSE
|
MAJOR
|
YES
|
Appendix 2
Drill Hole location data for holes reported in this Press-Release Infill Drilling Orebody C (C-SE and C-CENTRAL).
Hole ID
|
Easting
(m)
|
Northing
(m)
|
Elevation
(m)
|
Total
Depth
(m)
|
Collar
Azimuth
(°)
|
Collar
Dip (°)
|
Date
|
Orebody
|
Drilling
Company
|
Technical
Report-
2019
|
FTS1537
|
512761.01
|
7817072.58
|
487.80
|
72.86
|
188.86
|
-34.63
|
16/01/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1544
|
512741.90
|
7816981.58
|
481.28
|
83.70
|
84.29
|
-16.43
|
28/05/2018
|
Corpo CCE
|
JAGUAR
|
YES
|
FTS1545
|
512742.43
|
7816981.30
|
481.19
|
125.24
|
6.38
|
-29.07
|
18/05/2018
|
Corpo CCE
|
JAGUAR
|
YES
|
FTS1546
|
512741.59
|
7816981.65
|
481.21
|
77.88
|
41.02
|
-33.95
|
18/05/2018
|
Corpo CCE
|
JAGUAR
|
YES
|
FTS1547A
|
512741.75
|
7816981.59
|
481.25
|
111.59
|
18.31
|
-34.18
|
25/06/2018
|
Corpo CCE
|
JAGUAR
|
YES
|
FTS1574
|
512929.31
|
7816980.17
|
494.69
|
131.22
|
286.01
|
-64.67
|
29/05/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1627
|
513050.38
|
7817004.04
|
342.60
|
111.85
|
225.00
|
18.29
|
9/7/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1628A
|
513049.91
|
7816986.66
|
341.73
|
120.98
|
262.15
|
3.24
|
20/11/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1629
|
513050.14
|
7816986.40
|
341.67
|
110.19
|
254.78
|
3.08
|
19/11/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1630
|
513049.65
|
7816986.92
|
341.54
|
96.85
|
250.19
|
4.96
|
10/11/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1631
|
513049.89
|
7816986.62
|
341.53
|
91.10
|
235.71
|
4.84
|
10/11/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1632
|
513050.19
|
7816986.39
|
341.53
|
84.95
|
224.80
|
4.38
|
9/11/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1649
|
512946.20
|
7816896.99
|
415.32
|
46.35
|
2.46
|
30.58
|
12/9/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1650
|
512946.78
|
7816896.76
|
415.35
|
45.45
|
26.76
|
30.00
|
12/9/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1651
|
512949.31
|
7816896.09
|
414.86
|
61.09
|
340.14
|
18.42
|
5/12/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1652
|
512948.89
|
7816896.25
|
414.85
|
79.95
|
329.38
|
13.22
|
5/12/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1659
|
512949.22
|
7816895.77
|
413.24
|
65.44
|
55.08
|
-12.71
|
24/09/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1660
|
512949.82
|
7816895.92
|
413.97
|
65.25
|
31.69
|
-14.16
|
5/12/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1661
|
512949.46
|
7816896.13
|
414.07
|
69.03
|
10.20
|
-11.00
|
4/12/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1662
|
512946.40
|
7816897.05
|
413.69
|
75.20
|
353.58
|
-13.57
|
16/10/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1663
|
512945.87
|
7816897.25
|
413.76
|
85.81
|
342.69
|
-10.79
|
15/10/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1664
|
512945.46
|
7816897.41
|
413.82
|
96.63
|
335.16
|
-8.57
|
17/10/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1682
|
513051.17
|
7816985.58
|
341.83
|
71.51
|
207.79
|
4.68
|
27/11/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1683
|
513049.74
|
7816986.74
|
341.00
|
92.95
|
263.72
|
-12.82
|
6/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1684
|
513050.62
|
7816985.94
|
341.27
|
84.35
|
255.01
|
-17.08
|
6/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1685
|
513051.00
|
7816985.85
|
341.31
|
77.59
|
244.84
|
-16.88
|
7/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1686
|
513051.33
|
7816985.77
|
341.32
|
82.87
|
231.49
|
-20.97
|
11/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1687
|
513051.30
|
7816985.20
|
341.10
|
66.99
|
210.47
|
-22.11
|
11/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1688
|
513051.75
|
7816984.84
|
341.12
|
75.79
|
186.22
|
-22.64
|
11/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1690
|
512781.32
|
7817136.22
|
495.03
|
137.48
|
254.76
|
-45.08
|
9/11/2018
|
Corpo CCE
|
JAGUAR
|
YES
|
FTS1691
|
512781.30
|
7817135.65
|
495.14
|
121.00
|
232.62
|
-47.85
|
17/01/2019
|
Corpo CCE
|
JAGUAR
|
NO
|
FTS1692
|
512781.26
|
7817136.57
|
495.26
|
148.35
|
272.70
|
-39.78
|
22/01/2019
|
Corpo CCE
|
JAGUAR
|
NO
|
FTS1693
|
512781.27
|
7817136.80
|
495.36
|
175.81
|
282.49
|
-34.30
|
22/01/2019
|
Corpo CCE
|
JAGUAR
|
NO
|
FTS1717
|
513020.74
|
7817055.05
|
345.09
|
132.55
|
266.11
|
-16.66
|
12/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1671
|
513024.73
|
7817051.82
|
344.79
|
154.75
|
177.71
|
-22.34
|
5/12/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1672
|
513024.00
|
7817053.23
|
345.14
|
131.90
|
196.30
|
-27.58
|
6/12/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1673
|
513023.23
|
7817053.59
|
345.11
|
119.75
|
215.24
|
-31.15
|
12/8/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1674
|
513022.47
|
7817054.16
|
344.91
|
118.40
|
241.44
|
-28.76
|
11/12/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1675
|
513021.44
|
7817055.10
|
345.06
|
133.50
|
262.68
|
-20.39
|
12/12/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1676
|
513025.11
|
7817052.90
|
344.95
|
145.80
|
168.32
|
-29.78
|
29/11/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1677
|
513024.43
|
7817052.77
|
344.79
|
125.65
|
183.16
|
-34.14
|
29/11/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1706
|
513023.67
|
7817053.47
|
344.90
|
112.80
|
202.84
|
-39.76
|
1/12/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1707
|
513022.37
|
7817054.27
|
344.80
|
126.00
|
240.13
|
-39.76
|
28/11/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1708
|
513021.89
|
7817054.53
|
344.80
|
114.50
|
252.27
|
-35.83
|
1/12/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1709
|
513021.16
|
7817055.22
|
344.85
|
126.40
|
266.23
|
-27.86
|
13/12/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1711
|
513024.23
|
7817053.32
|
344.77
|
123.55
|
188.29
|
-46.70
|
13/12/2018
|
Corpo CSE
|
MAJOR
|
NO
|
View original content to download multimedia:http://www.prnewswire.com/news-releases/jaguar-mining-turmalina-exploration-results-extend-orebody-c-down-plunge-and-laterally-along-strike-updates-infill-drilling-300802950.html
SOURCE Jaguar Mining Inc.
View original content to download multimedia: http://www.newswire.ca/en/releases/archive/February2019/27/c2347.html