Mass Megawatts (MMMW) Announces 160 kW Solar Project The project is projected to have a pay for itself in about three to four years based on Massachusetts electric prices with current federal and state incentives. The 160-kilowatt project is designed to be able to reduce the cost of solar power by employing a furling technology borrowed from wind technology for protection in the case of high wind events. The technique improves the efficiency of solar arrays without adding significant additional expense. Mass Megawatts is responsible for the site development, fabrication, installation, and the interconnection obligations of the solar project. The solar project is in a low-income area in Worcester, Massachusetts.
The patented pending, Mass Megawatts ‘Solar Tracking System’ (STS) is designed to automatically adjust the position of solar panels throughout the day to receive an optimal level of direct sunlight. Unlike other solar tracking technologies, the Mass Megawatts STS utilizes a low-cost structure that adds stability to the overall system while also improving energy production levels. The STS also uses a proprietary mechanical innovation to limit dynamic and static loading on the tracker, which can occur during periods of high wind and extreme weather. The technology reduces wind-related stresses and system downtime. The STS allows Mass Megawatts to lower the cost of material and reduce the number of solar panels needed to generate the rated capacity. Due to this advantage, Mass Megawatts can deliver more solar power production at a price similar to lower-capacity, stationary systems.
In other news, Mass Megawatts announced plans to have two small solar units to explain the cost and output of the additional solar tracking features. The two units with one unit demonstrating the tracker and another unit being nearly identical without the tracker should help sell the new technology to many potential purchasers who would not easily be convinced to get involved with a new technology.
https://www.globenewswire.com/news-release/2021/11/02/2325262/0/en/Mass-Megawatts-MMMW-Announces-160-kW-Solar-Project-with-Virtual-Net-Metering-and-Brownfield-Advantages.html