Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Chart to Provide LNG Fuel System for Marine Emissions Reduction Project in Hamburg

GTLS

CLEVELAND, Dec. 23, 2013 (GLOBE NEWSWIRE) -- Chart Industries, Inc. (Nasdaq:GTLS), a leading independent global manufacturer of highly engineered equipment used in the production, storage and end-use of hydrocarbon and industrial gases, today announced that Chart Ferox, a.s., a member of its Distribution and Storage (D&S) segment in Europe, has been awarded a contract by Hybrid Port Energy Gmbh & Co. KG ("HPE"), a subsidiary of Becker Marine Systems Gmbh & Co. KG, to provide LNG fuel storage and processing equipment for an LNG-Hybrid Barge, which will operate in Hamburg's HafenCity.

The LNG-Hybrid Barge is a unique project between HPE and cruise liner operators and will provide power to cruise liners - in this case AIDA cruise liners - during their layovers in the port of Hamburg using LNG to significantly reduce emissions in accordance with current and future MARPOL regulations. The ability of the cruise vessel to switch from diesel to LNG is expected to eliminate sulfur oxide (SOX) and particle emissions, lower nitrogen oxides (NOX) by up to 80%, and reduce carbon dioxide by an additional 30%.

Chart's on-board LNG system is comprised of two 40ft LNG ISO intermodal containers and a skid mounted Gas Processing Unit (GPU), along with connecting equipment, controls, safety appliances and associated piping. LNG will be supplied in modular form using ISO containers swapped on a full-for-empty basis to eliminate the need for a dedicated bunkering station. All engineering, major capital equipment and assembly will be performed by Chart's operations in Decin, Czech Republic. Equipment delivery and commissioning is scheduled for the second quarter of 2014 with the LNG-Hybrid Barge planned to come into operation during the third quarter of 2014.

Chart is a leading independent global manufacturer of highly engineered equipment used in the production, storage and end-use of hydrocarbon and industrial gases. The majority of Chart's products are used throughout the liquid gas supply chain for purification, liquefaction, distribution, storage and end-use applications, the largest portion of which are energy-related. Chart has domestic operations located across the United States and an international presence in Asia, Australia and Europe. For more information, visit: http://www.chartindustries.com.

CONTACT: Ken Webster
         Vice President, Chief Accounting
         Officer and Controller
         216-626-1216
         ken.webster@chartindustries.com
         
         or
         
         Chris Rioux
         Manager of Investor Relations and
         Financial Planning
         216-626-1216
         chris.rioux@chartindustries.com


Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today