Post by
NamesJeb on Feb 19, 2021 8:46am
Adjacent to Whirlwind Jack (Dixie) LP Fault
This is not an advertisement for Great Bear, just shows what their recent drill results along the LP Fault that most likely carry into Whirlwind Jack are. Great Bear Drills 13.07 g/t Gold Over 16.95 m, and 32.01 g/t Gold Over 8.10 m; Reaches 250 Drill Holes Reported from LP Fault February 16, 2021, 7:30 am TSX-V: GBR VANCOUVER, BC, Feb. 16, 2021 /PRNewswire/ - Great Bear Resources Ltd. (the "Company" or "Great Bear") (TSXV: GBR) (OTCQX: GTBAF) today reported results from its ongoing 2021 exploration program at its 100% owned flagship Dixie Project in the Red Lake district of Ontario. Chris Taylor, President and CEO of Great Bear said, "The pace of incoming results continues to accelerate, and we've now reported 250 drill holes from the LP Fault. Most of the 20 drill holes reported in this release occur within 75 - 100 metre wide previously undrilled gaps along a 1.1 kilometre segment of the 4.2 kilometre long grid drilling area of the central LP Fault zone. Once again, we observed the same continuity of gold mineralization on the finer scale that has been previously observed with widely spaced drilling. This news release provides results from 20 new LP Fault drill holes completed along 1.1 kilometres of strike length. Great Bear has now published results from 250 LP Fault drill holes and anticipates up to 400 LP Fault drill holes will be completed by the end of 2021. The new drill results from this release are provided in Table 1, Figure 1, Figure 2 and Figure 3 show drill results in map, long section and 3D views. New Drill Results High-grade drill results include: 13.07 g/t gold over 16.95 metres from 195.50 to 212.45 metres in drill hole BR-251 on drill section 19950. This section is located 25 metres to the northwest of the drill holes highlighted on section 19925 in the Company's last news release of February 8, 2021. 32.01 g/t gold over 8.10 metres from 103.80 to 111.90 metres in drill hole BR-232 on drill section 20375 (located 425 metres northwest of drill section 19950). Bulk tonnage drill results include: 3.67 g/t gold over 45.45 metres from 72.00 to 117.45 metres in drill hole BR-252 on drill section 19950, which included a high-grade core of 85.50 g/t gold over 0.50 metres from 80.40 to 80.90 metres.