SOON, REAL SOONWhen this rig gets going we ROCK, guy`s the weather is not a problem for TCF ,they will be about 7 k`s out on 1 of the 4 platforms that are there,they will be attached to one of them for about 4 months at a time,so basicaly they will be wintering there and still drilling. won`t stop production either,didn`t before.AS for this mine thing,man guy`s the war chit is 100 miles away in the OTHER direction, so NO this is really not a concern, imo. PS, we close.