Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Trillion Energy International Inc. C.TCF

Alternate Symbol(s):  TRLEF | C.TCF.W

Trillion Energy International Inc. is a Canada-based oil and gas producing company that strives to maximize shareholder value through a mix of offshore gas development and high-impact oil and gas exploration in Cudi-Gabar province SE Turkey. The Company is 49% owner of the South Akcakoca Sub-Basin (SASB) natural gas field, a natural gas development project with four offshore platforms, pipelines and gas plant located in shallow water black sea. The Company also has the Vranino 1-11 block, a prospective unconventional natural gas property in Bulgaria.


CSE:TCF - Post by User

Post by goldboyz2on Jan 13, 2023 9:43am
319 Views
Post# 35220759

weekly update TCF

weekly update TCF

WEEKLY DRILLING REPORT JANUARY 12, 2023

WELL: Guluc-2

  • Spudded December 10, 2022. Days since spud: 33
  • Progress: 0
  • Measured Depth: 3199 metres

Week Summary:

  1. Recover fish from 3198 metres depth – 29 metres of bottom hole assembly (BHA)
  2. Clean borehole and back ream
  3. Run in 9 5/8” x 9 7/8” casing to 3195 metres, perform casing cement job (3 days)
  4. Wait on Cement (WOC) to set
  5. Perform pressure tests – all tests good
Further Activities:
  1. Drill out bottom cement plugs
  2. Drill 8 1/2” x 9” hole from 3198 metres to about MD of 4000 metres (TD)
  3. Put in and cement 7”  casing 
  4. Wait on cement
  5. Evaluate Logging While Drilling (LWD) data to pick perforation intervals
  6. Perforate and test gas zones.
  7. Turn over to Production Operating Partner

The well Guluc-2 has just finished cementing 9 5/8" x 9 7/8" casing to 3195 metres measured depth (MD). The next stage is to drill the 8 1/2" x 9 " hole from 3195 metres downward through the gas pay zones to the MD of 4000 metres. Guluc-2 is currently on time, on budget and on target.

<< Previous
Bullboard Posts
Next >>