Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Continental Gold Limited New CGOOF



GREY:CGOOF - Post by User

Post by MrBiggeron Jan 31, 2018 8:03am
153 Views
Post# 27468723

OMG!!!! Insane assays!!

OMG!!!! Insane assays!!ORONTO, Jan. 31, 2018 (GLOBE NEWSWIRE) -- Continental Gold Inc. (TSX:CNL) (OTCQX:CGOOF) (“Continental” or the “Company”) is pleased to announce high-grade assay results from its 2018 exploration drilling program at its 100%-owned Buritic project in Antioquia, Colombia. The Company is well underway with its 137,000-metre drill program for 2018 and presently has nine diamond drill rigs in operation with additional rigs scheduled to commence drilling over the next few weeks. The focus of the program is to both increase and upgrade mineral resources to higher classification categories by testing for high-grade and Broad Mineralized Zones (“BMZ”) within both the mineral reserve and mineral resource envelopes as well as high-impact targets along strike of existing mineral resources and grassroots targets proximal to existing and proposed infrastructure. The Company remains well financed with approximately US$316 million of available liquidity as of January 1, 2018.

Figure 1 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/38ec7a5b-70cd-41df-81bc-c4d265d652ff.

Figure 2 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/9cc7a8b0-76f3-48f0-9455-8b21109d8dfd.

Figure 3 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/b66ffd38-4283-448f-97c0-a59d270871e0.

Drill-Hole Highlights (referenced in Figures 2 and 3)

  • 35.10 metres @ 8.35 g/t gold and 17 g/t silver (BUUY356)
  • 35.15 metres @ 5.30 g/t gold and 5 g/t silver (BUUY357)
  • 35.40 metres @ 15.43 g/t gold and 13 g/t silver (BUUY361)
  • 20.55 metres @ 70.87 g/t gold and 29 g/t silver (BUUY363)

“Drilling within the initial BMZ targeted by our geology team continues to exceed expectations with very high grades and widths that are far superior than the current mineral resource estimate block model,” commented Ari Sussman, CEO. “With our most active year of exploration in Company history well underway, we look forward to realizing the potential of our robust precious metal mineral system at the Buritic project. Additionally, early-stage exploration continues to advance at our Berlin project and we anticipate making a drilling decision mid2018.”

BMZ Details (referenced in Figures 1, 2 and 3)

The BMZ consists of a group of modelled precious metal-bearing veins in the current mineral resource estimate block model with mineralization occurring between these veins, generally in the form of veinlets at oblique angles to strike. The majority of the mineralization between modelled veins is not in the current mineral resource estimate, providing potential upside both in terms of identifying significantly broader and more productive zones for mining and increased mineral resources. To date, the Company has identified six BMZs for testing and will systematically drill each target zone as underground mine development advances. The results in this press release are from drill testing of the first BMZ zone (“BMZ1”) and is defined as a matrix of the east-west trending FW, San Antonio and HW veins as well as a package of a NWSE vein and subsidiary veinlets.

A fan of eight underground diamond drill holes were completed from a new chamber located off of a commercial- scale ramp currently being constructed in the Yaragu vein system. Results announced herein have successfully extended the first BMZ zone by 65 vertical metres (1,420 RL) with the zone now measuring approximately 30 metres along strike by 26 metres true horizontal width by 165 metres vertical. The zone remains open up dip and at depth. The Company will continue to systematically test for vertical extensions to the zone as the underground ramp progresses providing deeper locations for short-hole drilling. A composite weighted average of all drill holes intersecting the BMZ in this release is as follows:

  • 22.6 metres @ 15.34 g/t gold and 14 g/t silver

Nine drill rigs continue to operate with numerous holes completed and awaiting assays. Results are expected to continue to be released in a timely manner.

Table I: Drill Hole Results (BMZ1 intervals highlighted below)

Hole ID From
(m)
To
(m)
Intercept
Interval*

(m)
Gold**
(g/t)
Silver**
(g/t)
Vein Domain Mid-Point
Elevation

(m)
True Width
(m)
BUUY353 20.10 22.65 2.55 7.11 8.2 C11 1494 2.09
  25.30 25.80 0.50 17.3 5.7 C11 1492 0.41
  60.50 75.00 14.50 6.04 14.9 BMZ1 1469 12.03
incl 66.60 67.65 1.05 55.20 84.2   1473 0.87
and 74.50 75.00 0.50 12.50 1.3   1469 0.42
BUUY355 52.60 61.10 8.50 5.04 11.5 BMZ1 1477 7.50
incl 59.00 59.50 0.50 12.65 45.4   1477 0.44
BUUY356 31.80 33.00 1.20 6.64 5.9 C10 1487 1.01
  46.70 81.80 35.10 8.35 17.0 BMZ1 1460 29.51
incl 48.05 48.55 0.50 33.40 29.2   1478 0.42
and 60.75 61.25 0.50 320.00 579.0   1471 0.42
  93.30 95.90 2.60 5.53 18.7 VND10 1453 2.18
  153.50 154.00 0.50 11.3 6.7 N20 1421 0.42
BUUY357 48.40 83.55 35.15 5.30 5.0 BMZ1 1447 25.37
incl 59.65 60.25 0.60 144.50 84.0   1462 0.43
and 82.55 83.05 0.50 94.20 43.5   1447 0.36
  138.80 140.05 1.25 5.43 38.7 VNAD9 1408 0.89
BUUY358 37.40 41.60 4.20 4.53 6.7 C11 1473 2.51
  71.60 84.00 12.40 3.98 7.1 BMZ1 1440 7.39
incl 72.30 72.80 0.50 37.20 23.2   1448 0.30
  114.50 119.20 4.70 8.25 27.1 SA12+FWV11 1413 2.79
incl 115.50 116.00 0.50 41.00 209.0   1415 0.3
BUUY359 11.70 12.30 0.60 15.70 9.3 C20 1494 0.34
  83.60 102.70 19.10 5.76 23.1 BMZ1 1420 10.36
incl 92.20 92.70 0.50 17.50 39.5   1428 0.27
and 94.40 95.00 0.60 30.60 359.0   1426 0.33
and 101.40 102.70 1.30 21.10 55.7   1419 0.70
BUUY361 21.20 21.80 0.60 12.95 14.0 C11 1491 0.46
  38.05 39.65 1.60 6.12 7.5 SOF10 1479 1.23
  49.40 84.80 35.40 15.43 12.6 BMZ1 1451 27.12
incl 63.75 67.70 3.95 92.23 73.8   1462 3.03
incl 63.75 64.35 0.60 521.00 265.0   1464 0.46
and 81.70 82.70 1.00 133.45 66.0   1452 0.77
incl 81.70 82.20 0.50 234.00 63.2   1452 0.38
BUUY363 56.70 57.20 0.50 14.10 3.7 HWV1 1459 0.27
  64.45 85.00 20.55 70.87 29.0 BMZ1 1438 11.11
  65.80 66.80 1.00 1387.90 278.2 HWV2 1452 0.54
incl 65.80 66.30 0.50 2740.00 516.0   1452 0.27
and 77.60 78.30 0.70 43.40 362.0   1443 0.38
  167.10 168.10 1.00 6.89 25.0 VNAD9 1373 0.56
                 

 

*   Intercepts calculated for minimum intervals of 0.5 metres. Drill holes designated “BUUY” were collared from underground.
**   Grades herein are reported as uncapped values.
    Note: Certain drill holes went through narrow mined-out tunnels and, for those intersections, precious metal grades from either the May 2015 NP 43-101 mineral resource block model or channel sampling results previously announced were incorporated into the overall interval. If neither were available, a grade of nil was assigned.
     

Geological Description of the Buritic Project

Continental’s 100%-owned, 70,764-hectare project, Buritic, contains several known areas of high-grade gold and silver mineralization, of base metal carbonate-style (“Stage I”) variably overprinted by texturally and chemically distinctive high-grade (“Stage II”) mineralization. The two most extensively explored of these areas (the Yaragu and Veta Sur systems) are central to this land package. The Yaragu system has been drill-outlined along 1,100 metres of strike and 1,700 vertical metres and partially sampled in underground developments. The Veta Sur system has been drill-outlined along 1,000+ metres of strike and 1,800 vertical metres and has been partially sampled in underground developments. Both systems are characterized by multiple, steeply-dipping veins and broader, more disseminated mineralization and both remain open at depth and along strike, at high grades.

Technical Information

Mauricio Castaeda, Vice-President, Exploration of the Company and a qualified person for the purpose of NI 43101, has prepared or supervised the preparation of, or approved, as applicable, the technical information contained in this press release.

Reported intervals include minimum weighted averages of 3 g/t gold equivalent (70:1 Au/Ag) over core lengths of at least 1.0 metres. Assays are uncut except where indicated.

The Company utilizes a rigorous, industry-standard QA/QC program. HQ and NQ core is sawn or split with one-half shipped to a sample preparation lab in Medelln run by ALS Colombia Limited (“ALS”) in Colombia, whereas BQ core samples are full core. Samples are then shipped for analysis to an ALS-certified assay laboratory in Lima, Peru. The remainder of the core is stored in a secured storage facility for future assay verification. Blanks, duplicates and certified reference standards are inserted into the sample stream to monitor laboratory performance and a portion of the samples are periodically check assayed at SGS Colombia S.A., a certified assay laboratory in Medelln, Colombia.

The Company does not receive assay results for drill holes in sequential order; however, all significant assay results are publicly reported.

For information on the Buritic project, please refer to the technical report, prepared in accordance with NI 43101, entitled “Buritic Project NI 43–101 Technical Report Feasibility Study, Antioquia, Colombia” and dated March 29, 2016 with an effective date of February 24, 2016, led by independent consultants JDS Energy & Mining Inc. The technical report is available on SEDAR at www.sedar.com, on the OTCQX at www.otcmarkets.com and on the Company website at www.continentalgold.com.


<< Previous
Bullboard Posts
Next >>