RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:John Helmer ArticleAltaR: Found 2 maps in this NR (24 Jan 2017), link below. Are those the same you have seen?
https://www.columbusgoldcorp.com/s/NewsReleases.asp?ReportID=776512&_Type=News-Releases&_Title=Columbus-Gold-Mobilizing-for-Exploration-Drilling-at-Montagne-dOr-Gold-Depo...
- First map: Drill hole map, the one hole for testing the depth is hole 01, it's within the JV area.
www.columbusgold.com/i/nr/2017-01-24-map.pdf www.columbusgold.com/i/nr/2017-01-24-xsection.pdf - Second map: This is a cross section map, length for that proposed hole (01) is 740m, so depth is around 600m from the surface for that hole (top part of the hill). This hole is directed from S to N and seems to be designed to envelope the current deposit. The ownership of the deposit below the 250m depth would depend on how the JV is written. The depth of the pit could be around 250m, and anything below that would need a UG operation. May be IR could help. If CEO Robert Guistra, or a senior staff of CGT are present at PDAC in Toronto (from today until 8 March), perhaps someone could corner them and pose a question or two.
GH