Up or down Poise ?https://www.petrooneenergy.com/files/pdf/2012_04_03.pdf
"Shortly after that early test, the water cut
increased to the point that the well was shut in pending further study. The water cut increase is believed
by the Company’s independent consultants to be attributable to the lower Alida zone. Therefore, the
Company’s independent consultants subsequently recommended that a horizontal leg approximately
600 metres in length be drilled from the existing wellbore into the adjacent portion of the oil bearing upper Frobisher"
https://www.stockhouse.com/Bullboards/MessageDetail.aspx?p=0&m=30810016&l=0&r=0&s=POP&t=LIST
IF it goes to .15 cents I will be right beside you.)