Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Orbite Technologies Inc EORBF

Orbite Technologies Inc is a Canada-based mineral-processing and resource development company. The firm is organised into the following segments; Specialty Products, Waste Monetization and Commodity Minerals. It produces alumina, silica, hematite, magnesium oxide, titanium oxide, smelter-grade alumina, rare earth oxides and rare metal oxides. The operation plant is based in Canada.


GREY:EORBF - Post by User

Post by markus24on Jun 21, 2019 6:13pm
366 Views
Post# 29851385

It`s over

It`s over

LAVAL, Qubec, June 21, 2019 (GLOBE NEWSWIRE) -- Orbite Technologies Inc. (NEX: ORT.H) (“Orbite” or the “Company”) today announced the immediate shutdown of operations at the HPA Plant due to technical problems with the Outotec calcination equipment.

(Definitions of the capitalized terms used herein can be found at the end of this press release.)

  • As previously disclosed, the start-up bed of amorphous HPA was injected into the decomposer and it was filled to its operational level. The upstream hydrometallurgical section was also in full operation and ACH crystal transfer into the decomposer had commenced.
  • Purity of the ACH material produced in the hydrometallurgical section is excellent and is superior to 5N purity (5N+ HPA equivalent).
  • Orbite successfully operated the decomposer over several weeks and reached ACH crystal injection rates of 5 tpd (equivalent to1 tpd of HPA) and maintained a steady injection rate between 3 and 4 tpd for 4 days.
  • The transfer of gamma HPA from the decomposer into the calciner was successfully done at rates up to 2.5 tpd of HPA.  
  • The calciner was almost filled to operating levels and Orbite was starting to discharge HPA from the calciner when operations observed abnormal variations with the material fluidisation in the calciner bed, leading to the breakage of four ceramic heating tubes in the calciner and one ceramic heating tube in the decomposer.
  • After careful analysis of the available data with Outotec’s onsite representative, Orbite has determined that despite the numerous modifications made to the calcination system over the past several months, the electrical heating system, as designed and supplied by Outotec, is not robust enough to reliably achieve the production of HPA without experiencing breakages and production slow downs.
  • After discussions with its legal advisors and the court appointed Monitor, the Company has determined there is not enough time or financial resources to try to once again address the technical issues encountered with the Outotec supplied equipment whilst remaining under CCAA protection.
  • Accordingly, Orbite will immediately implement significant cost reduction measures with a view to improving its cash-flow situation to allow Orbite, with the assistance of the Monitor to conduct a SISP. The cost reduction measures will include:
    • Shutting down operations at the HPA Plant;
    • Implementing a care and maintenance plan for the HPA Plant; and
    • proceeding with the temporary lay-off of all non-essential employees. 
  •  A number of employees will remain until operations at the HPA Plant are safely terminated. The remaining employees will assist the Monitor in implementing the next steps and in maintaining the security and integrity of the plant equipment.
  • Orbite deeply regrets this turn of events. The Orbite process, once again performed extremely well with 5N+ precursor materials produced at stable, industrial production rates and 4N7 HPA produced on the first production run, a remarkable achievement.
  • The shutdown of operations is the direct result of supplied equipment and not a process issue.

“I would like to thank all of our employees and our financial partners that have supported us over the last two years and have worked so extremely hard to resolve the issues with the Outotec calcination equipment.  Our process was yielding, on a consistent basis, the highest purity levels we had ever attained at the plant and we were well positioned to achieve our goal to exit from CCAA protection while protecting all of stakeholder’s interests. Unfortunately, the industrial inadequacy of the Outotec supplied calcination equipment, which forced us into CCAA protection in 2017 will now push us into a sales or liquidation process. 

Close to 30M$ was invested by Orbite in purchasing and installing this equipment and over $7.5M by Outotec in designing and implementing solutions to the original design deficiencies encountered in 2017. Unfortunately, despite all the time, financial resources and effort involved, the Outotec calcination equipment is still inadequate and flawed. stated Glenn Kelly, CEO of Orbite.

The Company will provide further updates as developments oc


Read more at https://stockhouse.com/news/press-releases/2019/06/21/orbite-shuts-down-operations-at-its-hpa-plant-due-to-problems-with-outotec#k2Si9uZpm3UeVTYp.99