RE: From IRWhat grade does RSC need to see in %/ton to be considered for mining profitably? Just to understand the economics.
>>>>It would cost around 35$ per tonne to mine the rock.
So the most result NR showed a nice 1.97% showing over 6.7 metres at the fault in the hangingwall, for 39lb/ton of U308. At $150 US/lb U308, we're looking at $5850/ton. Costs are six tenths of one percent at that level, which is virtually non-existent.
I can't wait for the results from MT-07-49:
"Hole MT-07-49 is without doubt the most promising hole. With a pierce point 185 metres to the north of AM-15 in the middle part of the ACF, this hole shows that the mineralization extends to the north. The 3.8-metre length of mineralized zone showed the presence of pitchblende over its entire length, with a cps of 11,500."