Lower Churchill will get built boysThe boys at Altius have no doubt the Lower Churchill hydro project will be built because Danny is on a fresh new mandate and the painful legacy of the Upper Churchill fiasco weighs on the pysche of all Newfoundlanders and Labradorians. Look for the power to be routed straight though the Rock and will eventually power the entire industrial complex in Placentia Bay and will allow the government to finally close down the 5000 MW Holyrood generating station that burns fuel oil and costs way to much to operate. Any excess power will likely flow to the rest of the Maritimes through an undersea link to Cape Breton and the rest of the mainland grid. Congratulations to those longs who weathered the storm yesterday. Nice to see the boys didnt have to buyback but a fraction of the shares to get us moving in the right direction again. Cheers, Droid.