RE:RE:placement fully taken plus over allotment from the 7/16 short form prospectus:
"A *Ukrainian TEO is a mandatory Ukrainian feasibility study, similar to a feasibility study, and necessary before undertaking detailed engineering, procurement and construction studies at the Shymanivske Project. A Ukrainian TEO will be completed in parallel by a Ukraine Design Institute as required for in country permitting. These studies are being completed in parallel to ensure the feasibility study is compliant with Ukrainian design standards and building codes and likewise to ensure the Ukrainian TEO mine sequence and beneficiation plant design are identical to the feasibility study. Completion of the feasibility study and Ukrainian TEO is expected to occur in the first quarter of 2022."