43-101 DA, you said the following
"Remember that ressource estimate of one area or 43-101 is not a "FIRM" answer. They always take the low end of things and make it more "firm" with PEA.. There are still some holes pending.."
The 43-101 will catagorize holes into measured and indicated or inferred. Measured and indicated are solid and what a project can be financed on, lendinging institutuions generally will not finance inferred ounces. Updates in the 43-101 can increase total ounces through drilling new areas or step outs and or move inferred to the measured and indicated catageory to change ounces to inferred usually requires more infill drilling with closer spacing than previous drilling. Your comment like a lot of your other ones on taking the low end of things and make it more firm, makes no sense. The 43-101 will be a definitive account of the current ounces based on drilling that was included in the 43-101. A PEA will not upgrade ounces unless the 43-101 is upgraded. A PEA will address the economics and viablilty of a project.