Lots of news to comeAccording to the CAN website we have received results from 154 holes and they have completed 240 holes out of an estimated 350 by Earle before end. There should 86 holes that have been drilled that are in the system.(i.e, being logged, split and or at labs) Add another 110 to be drilled and we can expect results on 196 holes by year end or the the next 5 1/2 months
If they put them out in batches of 6 (which I doubt) that be another 32 NR's or an average of 1.3 NR's a week.
I would say there is lots of room to move this stock with that many holes to come, in a failry short time frame, even if they are not all as good as today.(which would be safe to assume they will not be)
GLTA longs