Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Discovery Silver Corp T.DSV

Alternate Symbol(s):  DSVSF

Discovery Silver Corp. (Discovery Silver) is a Canada-based mineral exploration company focused on identifying, defining, and developing mineral deposits, primarily in Mexico. Discovery Silver’s projects include Cordero project. The Company’s Cordero project is located on the eastern edge of the Sierra Madre Occidental mountains in the northern part of the Central Mexican Silver Belt, Mexico’s premier porphyry and carbonate replacement deposit district.


TSX:DSV - Post by User

Post by Bluetickon Nov 30, 2021 7:17am
194 Views
Post# 34178989

News

News

Discovery Silver Reports Preliminary Economic Assessment on Cordero with After-Tax NPV of US$1.2 B, IRR of 38% and Payback of 2.0 Years

  •  
  •  
  •  
·23 min read
In this article:
  •  
  •  
  •  

Figure 1

After-Tax Free Cash Flow
After-Tax Free Cash Flow
After-Tax Free Cash Flow

Figure 2

LOM Production & AISC
LOM Production & AISC
LOM Production & AISC

Figure 3

APPENDIX D - LOM MINE PLAN SUMMARY
APPENDIX D - LOM MINE PLAN SUMMARY
APPENDIX D - LOM MINE PLAN SUMMARY

Figure 4

APPENDIX E - LOM PROCESS THROUGHPUT SUMMARY
APPENDIX E - LOM PROCESS THROUGHPUT SUMMARY
APPENDIX E - LOM PROCESS THROUGHPUT SUMMARY

Figure 5

PHASE 1
PHASE 1
PHASE 1

Figure 6

PHASE 2
PHASE 2
PHASE 2

Figure 7

APPENDIX H - LONG SECTIONS / CROSS SECTIONS
APPENDIX H - LONG SECTIONS / CROSS SECTIONS
APPENDIX H - LONG SECTIONS / CROSS SECTIONS

Figure 8

LONG SECTION A-A’ (looking NW)
LONG SECTION A-A’ (looking NW)
LONG SECTION A-A’ (looking NW)

Figure 9

LONG SECTION B-B’ (looking NW)
LONG SECTION B-B’ (looking NW)
LONG SECTION B-B’ (looking NW)

Figure 10

CROSS SECTION C-C’ (looking NE)
CROSS SECTION C-C’ (looking NE)
CROSS SECTION C-C’ (looking NE)

Figure 11

CROSS SECTION D-D’ (looking NE)
CROSS SECTION D-D’ (looking NE)
CROSS SECTION D-D’ (looking NE)

Figure 12

CROSS SECTION E-E’ (looking NE)
CROSS SECTION E-E’ (looking NE)
CROSS SECTION E-E’ (looking NE)

Figure 13

APPENDIX I - SITE LAYOUT
APPENDIX I - SITE LAYOUT
APPENDIX I - SITE LAYOUT

TORONTO, Nov. 30, 2021 (GLOBE NEWSWIRE) -- Discovery Silver Corp. (TSX-V: DSV, OTCQX: DSVSF) (“Discovery” or the “Company”) is pleased to announce results from its Preliminary Economic Assessment (“PEA” or “the Study”) on its 100%-owned Cordero silver project (“Cordero” or “the Project”) located in Chihuahua State, Mexico.

Study highlights include (all figures are in USD unless otherwise noted):

  • Excellent project economics: Base Case after-tax NPV5% of $1.2 B (C$1.5 B) and IRR of 38% (Ag - $22.00/oz, Au - $1,600/oz, Pb - $1.00/lb and Zn - $1.20/lb).

  • Exceptional silver price leverage: Upside Case after-tax NPV5% of $1.9 B (C$2.4 B) and IRR of 55% (Ag - $27.50/oz, Au - $1,880/oz, Pb - $1.10/lb and Zn - $1.45/lb based on one-year trailing 90th percentile prices).

  • Large-scale, high-margin, long mine life asset: 16-year mine life with average annual production of 26 Moz AgEq at an AISC of $12.35/oz AgEq.

  • Low capital intensity: initial development capex of $368 M; attractive NPV-to-capex ratio of 3.2x.

  • Rapid payback: post-tax payback of 2.0 years for Base Case and 1.4 years for Upside Case.

  • Technically robust study: 99% of tonnes processed in the PEA mine plan are in the Measured & Indicated category; process design and metallurgical recovery estimates are based on the Company’s comprehensive 2021 metallurgical testwork program.

  • Silver-dominant revenues: silver represents +60% of the net smelter return in the first five years of the mine life and +50% of the net smelter return over the life of mine, in-line with the senior/mid-tier silver producer group.

Taj Singh, President and CEO, states: “With annual AgEq production averaging more than 26 Moz over a +15-year mine life we believe this PEA clearly positions Cordero as a Tier 1 silver asset. This impressive scale of production is achieved through modest development capex of $368 M and returns excellent margins with AISC averaging less than $12.50/AgEq oz over the life of the mine. These costs highlight the benefits of existing local infrastructure, excellent metallurgy, and a straight-forward open pit mine with excellent grades and a low strip ratio.

“Importantly, the outstanding metrics demonstrated in the PEA are supported by a mine plan with more than 99% of tonnes in the Measured and Indicated category, and a simple and conventional process design based on our detailed metallurgical testwork program completed earlier this year. This provides us with a huge head start as we look ahead to the delivery of a Prefeasibility Study on Cordero in 2022.”

PEA SUMMARY:

Study support:

  • The Study is based on the updated Mineral Resource Estimate (“Resource”) press released on October 20, 2021 (see Appendices for Resource details), and the Company’s comprehensive metallurgical testwork program described in our press release dated September 7, 2021.

  • The PEA project team was led by Ausenco Engineering Canada Inc. (“Ausenco”), an industry leader in cost-effective design and construction. Ausenco was supported by AGP Mining Consultants Inc. (“AGP”) and Knight Pisold and Co. (USA) (“Knight Pisold”).

Project Economics:

Sensitivity of the Project’s expected after-tax NPV, IRR and payback at different commodity price assumptions is outlined in the table below:

 

Units

Base Case

Upside Case

Base Case +15%

Base Case -15%

After-Tax NPV (5% discount rate)

(US$ M)

$1,160

 

$1,889

 

$1,692

 

$622

 

Internal Rate of Return

(%)

 

38.2

%

 

54.6

%

 

49.9

%

 

25.2

%

Payback

(yrs)

 

2.0

   

1.4

   

1.6

   

3.5

 
  • Base Case price assumptions: Ag = $22.00/oz, Au = $1,600/oz, Pb = $1.00/lb, Zn = $1.20/lb

  • Upside Case price assumptions: Ag = $27.50/oz, Au = $1,880/oz, Pb = $1.10/lb, Zn = $1.45/lb based on one-year trailing 90th percentile prices

After-Tax Free Cash Flow:

A chart summarizing the expected annual and cumulative after-tax free cash flow (“FCF”) over the life-of-mine (“LOM”) is provided below:

https://www.globenewswire.com/NewsRoom/AttachmentNg/d1131062-ffa4-4091-b528-d23ac46806b3

Production & Costs:

Annual production over the LOM is expected to average 26 Moz AgEq with production averaging over 33 Moz AgEq when fully ramped up (Years 5 – 12); this positions Cordero as one of the largest silver mines globally.

 

Units

Year 1 – 4

Year 5 - 12

Year 13 -16

LOM

AgEq Produced - Average

(Moz)

29

33

9

26

AgEq Payable - Average

(Moz)

26

29

8

23

AgEq Produced - Total

(Moz)

117

265

37

426

AgEq Payable - Total

(Moz)

104

230

32

372

All-In Sustaining Cost (AISC)

(US$/AgEq oz)

$11.64

$11.77

$18.88

$12.35

Note – LOM production/payable totals include production from Year -1. AgEq Produced is metal recovered in dor/concentrate. AgEq Payable is metal payable from dor/concentrate and incorporates metal payment terms outlined in the Concentrate Terms section below. See Technical Disclosure section for AgEq and AISC calculation methodology.

LOM Production & AISC:

https://www.globenewswire.com/NewsRoom/AttachmentNg/dc1da013-9e05-4a0a-a7af-78b58ef8af4a

Note – Au/Pb/Zn production is shown on an AgEq basis based on: Ag = $22/oz, Au = $1,600/oz, Pb = $1.00/lb and Zn = $1.20/lb

OPERATIONS:

Mining:

The mine plan incorporates accelerated stripping as well as stockpiling of low-grade material in order to optimize the grade profile over the LOM.

  • The mine plan was completed by AGP and is based on a detailed mine design that incorporates mining dilution, safety berms and haul roads.

  • Mining rates over the life of the mine are relatively steady at 60 to 70 Mtpa.

  • The ultimate pit contains 719 Mt in total consisting of 228 Mt of mill feed and 491 Mt of waste for an average strip ratio of 2.2:1. The strip ratio is relatively even over the LOM.

  • Pit slope designs were based on an assessment by Knight Pisold that was supported by two geotechnical coreholes in the North Corridor and logging of core from two exploration coreholes in the South Corridor.

Processing:

Processing was broken into two phases to optimize the capital efficiency of the project.

  • Phase 1 throughput (Year -1 to Year 4)

    • Oxides: mined during the preproduction period and are crushed through the Phase 1 crushing plant and stacked on the heap leach from Year -1 to Year 3 at a throughput rate of 5 Mtpa. After Year 3 the Phase 1 crushing plant is dedicated to processing higher-value sulphide material with remaining oxide material processed as uncrushed ‘run-of-mine’ (“ROM”) material via heap leaching.

    • Sulphides: crushing, grinding and flotation circuit is constructed in Year -1 and processing occurs at a nameplate rate of 7.2 Mtpa from Year 1 to Year 4. During this period the mine plan focuses on high-grade material from the Pozo de Plata zone.

  • Phase 2 throughput (Year 5+)

    • Sulphides: two identical crushing, grinding and flotation circuits from Y5 onwards with total throughput of 14.4 Mtpa

Annual Throughput (Mt/a)

PHASE 1

PHASE 2

Year -1

Year 1

Year 2

Year 3

Year 4

Year 5+

Oxides / Heap Leach (Crushed)

5.0

5.0

5.0

5.0

-

-

Sulphides / Milling

-

5.8

7.2

7.2

10.8

14.4

Total Tonnes

5.0

10.8

12.2

12.2

10.8

14.4

  • Process design

    • Oxides: three-stage crushing (targeted crush size of 8 mm), agglomeration, heap leaching and refining in Year -1 to Year 3 and ROM dump leaching and refining in Year 4 to Year 6 to produce Ag-Au dor bars

    • Sulphides: three-stage crushing, grinding (targeted grind size of 200 micron) and flotation to produce Pb and Zn concentrates

Head grades:

The mine plan focuses on feeding higher grades to the mill earlier in the mine life:

  • Year 1 – 4: processing of higher-grade oxide material from the South Corridor and sulphide material predominantly from the Pozo de Plata zone

  • Year 5 – 12: processing of higher-grade sulphides from the NE Extension and the South Corridor

  • Year 13 – 16: processing of lower-grade material stockpiled during Year 1 to Year 12
     

HEAD GRADES

UNIT
 

PHASE 1

PHASE 2

LOM

Year 1 – 4

Year 5 – 12

Year 13 – 16

Oxides

         

Tonnes processed

(Mt)

25

4

-

29

Ag

(g/t)

37

29

-

36

Au

(g/t)

0.08

0.05

-

0.08

AgEq

(g/t)

43

33

-

42

Sulphides

         

Tonnes processed

(Mt)

31

115

52

199

Ag

(g/t)

57

32

13

31

Au

(g/t)

0.26

0.07

0.04

0.09

Pb

(%)

0.80

0.50

0.17

0.46

Zn

(%)

0.80

0.92

0.34

0.75

AgEq

(g/t)

118

88

34

80

Note – Phase 1 and LOM Oxide tonnes/grades include tonnes processed on the heap leach in Year -1

Recoveries:

  • Oxides: recoveries were based on coarse bottle roll tests and preliminary results from column leach tests completed in 2021. Recoveries average 56% for Ag and 63% for Au for crushed feed and 36% for Ag and 35% for Au for uncrushed ROM feed.

  • Sulphides: recoveries were based on the 2021 metallurgical test program which included lock-cycle tests and examined metal recoveries to the silver-lead concentrate and the silver-zinc concentrate at varying head grades for each of the major geological rock types at Cordero. Metal recoveries to the two concentrates are summarized below:

SULPHIDE RECOVERIES (weighted average)

PHASE 1

PHASE 2

LOM

Year 1 – 4

Year 5 – 12

Year 13 – 16

Ag

92%

83%

67%

84%

Au

19%

19%

19%

19%

Pb

90%

86%

69%

86%

Zn

85%

86%

74%

85%

Tailings Management Facility (TMF):

  • The TMF design was completed by Knight Pisold and is based on a conventional thickened tailings dam facility of downstream construction type.

  • The TMF is located directly west of the open pit. The design incorporates five dam lifts over the LOM.

  • Total capacity of the TMF is 179M m3 (252 Mt); this is significantly greater than the estimated volume requirement of 142M m3 based on the PEA mine plan.

  • An evaluation of using a dry-stacked tailings facility will be completed as part of pre-feasibility work.

CONCENTRATE TERMS:

Metal Payable:

  • Cordero is expected to produce clean, highly saleable concentrates with minimal penalty elements as established in the 2021 metallurgical test program.

  • Industry standard payables and deductions were applied to the Pb and Zn concentrates as per the table below. A metallurgical balance summary is included in the Appendices.

  • Approximately 85% of the Ag reports to the Pb concentrate where higher payabilities are received.
     

 

Ag

Au

Pb

Zn

Pb Concentrate

       

Average concentrate grade LOM

2,900 g/t

1.6 g/t

52

%

-

 

Payable metal

95

%

95

%

95

%

-

 

Minimum deduction

50 g/t

1 g/t

3 units

-

 

Zn Concentrate

       

Average concentrate grade LOM

300 g/t

0.5 g/t

-

 

51

%

Payable metal

70

%

70

%

-

 

85

%

Deduction

3 oz/t

1 g/t

-

 

-

 

Treatment/Refining Charges:

  • Treatment and refining charges were based on a review of spot and recent benchmark pricing and are summarized as follows:
     

PARAMETER

UNITS

PEA COST

SPOT

2021 BENCHMARK

TREATMENT/REFINING CHARGES

       

Treatment charge – Pb con

$/dmt

$100

~$60

$140

Treatment charge – Zn con

$/dmt

$200

~$80

$160

Ag refining charge – Pb con

$/oz

$1.00

~$0.75

$1.50

Concentrate Transportation:

  • Transportation costs assume trucking of the concentrate via containers to the international port at Guaymas, Sonora, and then shipping via ocean freight to Asia.

  • Estimated transportation costs (trucking, port handling and ocean freight) are $128/wmt for Pb concentrate and $116/wmt for Zn concentrate.

CAPITAL EXPENDITURES:

Initial Capital (for parallel processing of crushed oxides and sulphides)

  • Year -2: construction of on-site infrastructure, power line and the heap leach circuit with capacity of 5 Mtpa to process oxide/transition material (includes a three-stage oxide crushing circuit, heap leach pad/ponds and Merrill Crowe plant).

  • Year -1: first sulphide circuit with a capacity of 7.2 Mtpa (includes sulphide crushing circuit, ball mill and flotation plant) and construction of the TMF including the initial dam lift.

Expansion Capital (to expand plant to 14.4 Mtpa sulphides only)

  • Year 3: addition of second sulphide circuit to expand processing rate to 14.4 Mtpa by the addition of a ball mill and flotation circuit creating two parallel sulphide circuits. The crushing circuit previously used for oxides will be dedicated to sulphides from Year 4 onwards and will not require repurposing.

  • Year 8: expand flotation circuit with additional flotation cells, cyclones, filters and thickeners to accommodate the higher zinc grades from Year 9 to Year 11.

Sustaining Capital

  • TMF: the tailings dam will be completed in five lifts over the LOM at a total capital cost of $110 M ($15 M initial capex plus $95 M of sustaining capex).

    • Other: additional sustaining capex totals $113 M over the LOM and includes sustaining capital for the process plant and mobile equipment and replacements/refurbishments of infrastructure assets.

DESCRIPTION (all in US$ millions)

INITIAL CAPITAL

EXPANSION CAPITAL

SUSTAINING LOM CAPEX

TOTAL
LOM CAPEX

Year -2

Year -1

Year 3

Year 8

CAPITAL EXPENDITURES

           

Mining

$26

$1

   

$7

$33

Infrastructure

$34

$9

$10

 

$16

$69

Heap Leach + Oxide Plant

$71

$1

   

$4

$76

Sulphide Processing Plant

 

$95

$51

$23

$30

$199

Tailings Facility (TMF)

 

$15

   

$95

$110

Indirects

$22

$30

$17

$6

$4

$78

Owners Costs

$6

       

$6

Closure (net of Salvage Value)

       

$22

$22

Contingency

$28

$30

$16

$6

$29

$110

Capital Expenditures - Subtotals

$187

$181

$94

$35

$208

$704

$368

             

PRE-SULPHIDE OPERATIONS

           

Revenue

 

$121

       

Mining Costs

 

($110)

       

Process + G&A Costs

 

($27)

       

Operating Cash Flow for Year -1

 

($16)

       
             

NET FUNDING REQUIREMENT

$384

       
           

OPERATING COST ASSUMPTIONS:

Mining:

  • Mining is assumed to be completed by contract mining; estimated mining costs were based on contractor quotes for Cordero received by AGP

Processing and G&A Costs:

  • Processing costs for the heap leach and mill/flotation, and G&A costs were developed by Ausenco from first principles.

  • Sulphide processing costs benefit from a conventional flotation process design and low power costs. The targeted coarse grind size of 200 micron alleviates the need for a SAG mill.

  • G&A costs estimates are based on a small camp and administration office at site. The majority of the work force will be Mexican nationals commuting daily from the local town of Parral. Parral is 25 km south of Cordero and has a population of approximately 100,000. It is the regional government centre in the southern part of Chihuahua State and has a well-established service industry that supports numerous local mining operations.
     

PARAMETER

UNITS

PEA COST

OPERATING COSTS

   

Mining – Mill Feed

$/t mined

$2.16

Mining – Waste

$/t mined

$2.04

Processing – Heap leach crushed

$/t stacked

$3.84

Processing – Heap leach ROM

$/t stacked

$1.39

Processing – Milling (7.2 Mtpa)

$/t milled

$7.01

Processing – Milling (14.4 Mtpa)

$/t milled

$6.57

Site G&A (14.4 Mtpa)

$/t milled

$0.86

OPPORTUNITIES:

Work completed during the preparation of the PEA outlined a number of opportunities that have the potential to improve the economic and ESG performance of the project:

  • Mine life extension: there are over 300 Mt of Sulphide Resource that sit outside the PEA design pit but within the Resource pit shell. These resources as summarized below have the potential to extend the mine life and/or increase production levels at higher commodity prices.
     

Class

Tonnes

Grade

Contained Metal

Ag

Au

Pb

Zn

AgEq

Ag

Au

Pb

Zn

AgEq

(Mt)

(g/t)

(g/t)

(%)

(%)

(g/t)

(Moz)

(koz)

(Mlb)

(Mlb)

(Moz)

Measured

33

15

0.06

0.21

0.42

38

16

63

151

306

40

Indicated

187

16

0.04

0.23

0.45

40

94

221

952

1,869

238

M&I

220

16

0.04

0.23

0.45

39

110

284

1,103

2,175

278

Inferred

106

14

0.03

0.19

0.38

34

48

97

445

897

117

Note – the full Resource is provided in the Appendix; further details can be found in the Company’s October 21, 2021, press release.

  • Coarser grind size: metallurgical test work suggests higher recoveries may be achieved at coarse grind sizes (greater than the 200 micron used in the PEA). An evaluation of coarse particle flotation will be completed as part of the 2022 Prefeasibility Study (“PFS”). Coarse particle flotation has the potential to further reduce operating costs and water consumption.

  • Dry stack tailings: an evaluation of using dry stacked tailings to improve ESG performance will be completed as part of the PFS.

TECHNICAL DISCLOSURE:

  • Inferred material, representing 0.9% of the mill feed, is included in the total mill feed. Inferred resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as reserves.

  • Mineral resources that are not mineral reserves do not have demonstrated economic viability.

  • Readers are cautioned that the PEA is preliminary in nature and that there is no certainty the estimates utilized in the PEA will be realized.

  • A full technical report will be prepared in accordance with NI 43-101 and will be filed on SEDAR within 45 days of this press release.

  • AgEq is calculated based on the following commodity prices: Ag - $22.00/oz, Au - $1,600/oz, Pb - $1.00/lb and Zn - $1.20/lb.

  • All-in Sustaining cost (AISC) is calculated as: [Operating costs (mining, processing and G&A) + Royalties + Concentrate Transportation + Treatment & Refining Charges + Concentrate Penalties + Sustaining Capital (includes capital for TMF dams lifts with capacity for less than five years) + Closure Costs] / Payable AgEq ounces

APPENDIX:

An appendix with the following supporting information can be found at the end of the release or the following link: Appendices

Appendix A - Mineral Resource Estimate

Appendix B – After-Tax NPV/IRR/Payback Sensitivities

Appendix C - Pit Optimisation Parameters

Appendix D - LOM Mine Plan Summary

Appendix E - LOM Process Throughput Summary

Appendix F - Simplified Process Flowsheets

Appendix G – Metallurgical Balance Summary

Appendix H - Long Sections / Cross Sections

Appendix I - Site Layout

Appendix J - LOM Production & Cash Flow Schedule

About Discovery:

Discovery’s flagship project is its 100%-owned Cordero project, one of the world’s largest silver deposits. The PEA completed in November 2021 demonstrates that Cordero has the potential to be developed into a highly capital efficient mine that offers the combination of margin, size and scaleability. Cordero is located close to infrastructure in a prolific mining belt in Chihuahua State, Mexico. Continued exploration and project development at Cordero is supported by an industry leading balance sheet with cash of over C$75 million. Discovery was a recipient of the 2020 TSX Venture 50 award and the 2021 OTCQX Best 50 award.


On Behalf of the Board of Directors,
Taj Singh, M.Eng, P.Eng, CPA,
President, Chief Executive Officer and Director

For further information contact:

Forbes Gemmell, CFA
VP Corporate Development & Investor Relations
Phone: 416-613-9410
............Bluetick
<< Previous
Bullboard Posts
Next >>