Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Eagle Royalties Ltd. T.ER


Primary Symbol: C.ER Alternate Symbol(s):  ERYTF

Eagle Royalties is a royalty holding company created as a spin-out with the royalty assets of Eagle Plains Resources, a mineral exploration project generator exploring Western Canada for gold, critical-metals, uranium, lithium, rare earth elements and industrial minerals. Eagle Royalties holds royalties on over 50 projects owned by senior to junior mining and exploration companies. Eagle Roylaties flagship is the royalty at Banyan Gold's AurMac property where a 6.18m oz gold resource was announced in May 2023.


CSE:ER - Post by User

Bullboard Posts
Post by blacky2on Jan 21, 2010 1:25pm
243 Views
Post# 16704459

News

NewsEastmain Resources Inc. - Eau Claire Assays & Metallurgy Up to 12.07 g/t Au over 5.5 m 95.7 to 98.8% Gold recoveries

TORONTO, Jan 21, 2010 /PRNewswire via COMTEX News Network/ --

TSX Symbol: ER

Eastmain Resources Inc. (TSX:ER) is pleased to announce assay data from the last 16 drill holes of 2009 and additional metallurgical test results from its Eau Claire Gold Deposit, located in James Bay, Québec.

Holes 229 through 244 intersected 42 gold-bearing quartz-tourmaline veins, including numerous intersections containing over one-half ounce of gold. (Table 1). Additional metallurgical test work by SGS Lakefield Research on the P, JQ, R and S Veins indicates impressive total gold recoveries (gravity + flotation + cyanidation), ranging from approximately 95.7 to 98.8%. Further testing to determine other metallurgical parameters and optimal processing is still underway. As previously reported, high concentrations of the rare metals tellurium and bismuth occur as byproducts in gold-bearing veins at Eau Claire.

48 HQ holes totaling 14,619 metres were completed during the 2009 second phase program. Drill holes reported herein intersected the Main Group of Veins (P, JQ, R and S) near surface and the T Vein group of veins at depth.


Assay highlights include:

- 14.05 g/t Au over 1.0 m, including 17.75 g/t Au (0.52 oz/ton) over
0.5 m (ER09-231)
- 7.50 g/t Au over 8.0 m, including 60.90 g/t Au (1.78 oz/ton) over 0.5
m (ER09-232)
- 12.07 g/t Au over 5.5 m, including 41.10 g/t Au (1.20 oz/ton) over
0.5 m (ER09-233)
- 8.02 g/t Au over 2.0 m, including 16.65 g/t Au (0.49 oz/ton) over 0.5
m (ER09-234)
- 14.27 g/t Au over 1.5 m, including 39.60 g/t Au (1.16 oz/ton) over
0.5 m (ER09-235)
- 25.80 g/t Au over 1.0 m, including 44.10 g/t Au (1.29 oz/ton) over
0.5 m (ER09-236)
- 7.05 g/t Au over 3.5 m, including 26.70 g/t Au (0.78 oz/ton) over 0.5
m (ER09-237)
- 15.04 g/t Au over 1.0 m including 29.30 g/t Au (0.86 oz/ton) over 0.5
m (ER09-240)

Additional drilling is necessary to evaluate the resource potential of the T-Vein series. Holes ER09-235 to 239, 242 and 243 each intersected high-grade T-Vein intervals at vertical depths ranging from approximately 115 to 225 metres (152 to 283 metres down hole). ER09-236 intersected a one-metre-thick quartz-tourmaline vein containing 40 grains of visible gold grading 25.80 g/t Au, 50 metres down-dip from ER08-118, which assayed 29.74 g/t Au across a 1.50 metre interval. ER09-237 intersected multiple high-grade T-Vein intervals (T5, T6 and T7) 50 metres down-dip of ER08-145, which returned 24.57 g/t Au over 3.0 metres. ER09-239 intersected 0.83 g/t Au across 12.5 metres down-dip of ER08-136, which assayed 17.99 g/t Au across 4.7 metres and of ER08-148, which returned up to 15.49 g/t Au over 3.0 metres in T Vein intervals.

A total of 21,276 metres (68 HQ drill holes) were drilled in 2009 to expand the Eau Claire gold resource within the upper 300 metres. Over the last two years more than 25% of all vein intercepts drilled contain over one ounce gold per ton. 70% of all gold-enriched vein and schist material intersected at Eau Claire within this period contains one-half (0.50) ounce gold per ton over an average thickness of 1.34 metres.

Within the past 24 months, 500 gold-bearing quartz-tourmaline vein intervals with an average grade of 12.4 g/t Au (0.36 oz/ton), at an average thickness of 1.37 metres, have been intersected within the upper one-third of the deposit. 400 vein intervals contain an average grade of 15.2 g/t Au (0.44 oz/ton); 300 vein intervals averaged 18.4 g/t Au (0.54 oz/ton); 200 vein intervals contain an average of 24.6 g/t Au or 0.72 oz/ton; 100 vein intervals contain 42.6 g/t Au (1.25 oz/ton) and 50 intersections have an average of 66.4 g/t Au or 1.94 oz/ton (Table 2).

The Eau Claire deposit hosts a large number of exceptionally high-grade gold veins, from which three recent cyanidation tests of gravity tailings, completed by SGS Lakefield Research Limited, yielded excellent gold extractions. The finest grind material (P80 = 20 (micro)m, microns) gave a leach gold extraction of 98% which, when included with the gold recovered from gravity separation, gives a combined recovery of 98.8%. The coarsest grind test completed (P80 = 121 (micro)m) gave a cyanide leach gold extraction of 93% which, when added to the gold recovered by gravity separation, gave an overall gold recovery of 95.7%. Acid base accounting tests confirmed that waste from veins processed at SGS is non-acid generating and therefore does not pose any environmental liability.

The most recent resource estimate for the Eau Claire gold deposit, completed in 2005, was based on 182 gold-bearing vein intercepts. Drilling over the past two years has intersected 500 gold-bearing veins at a significantly higher grade than the previous estimate, within the upper 1/3 of the deposit. A substantial number of the current drill intercepts are from the T-Vein group, which is located north of the previous resource limits.

Definition drilling is still required to evaluate the resource potential of a high-grade vein system in the 850 West Zone and the newly discovered Boomerang Prospect, located approximately one-half kilometre east of the eastern margin of Eau Claire. Continued drilling is also warranted to expand the gold resource within main deposit and T-Vein group of veins at depth. Metallurgical test-work currently underway will be integrated with an updated resource calculation in 2010. Deposit and property scale drilling and surface exploration work is planned to continue throughout the year.

This news release was prepared by Dr. Donald Robinson, P. Geo., the qualified person supervising the project in accordance with NI 43-101.

About Eastmain Resources Inc. (TSX:ER)

Eastmain is a Canadian gold exploration company with 100% interest in the Eau Claire and Eastmain gold deposits. The Corporation has $16.5 Million in working capital, no debt and holds an interest in 12 projects within the James Bay District, including the Eleonore South property, where a gold discovery has been found in a similar geologic setting to Goldcorp's Roberto deposit. Eastmain's 2010 budget is $7.5 million for gold exploration in Quebec.

The statements made in this Press Release may contain forward-looking statements that may involve a number of risks. Actual events or results could differ materially from the Company's expectations and projections.


-------------------------------------------------------------------------
Table 1 Clearwater Project - Assay Data
-------------------------------------------------------------------------
2009 Eau Claire Assay Results

Hole ID From To Length Au Au Te g/t Te Vein ID Notes
-------------------------------------------------------------------------
m g/t oz/ton g/t oz/ton
-------------------------------------------------------------------------

ER09-230 34.3 34.8 0.50 10.65 0.31 11.70 0.34 R

45.1 46.1 1.00 12.75 0.37 19.32 0.56 S
incl. 45.1 45.6 0.50 24.30 0.71 36.20 1.06

ER09-231 5.5 6.5 1.00 14.05 0.41 17.05 0.50 H
incl. 6.0 6.5 0.50 17.75 0.52 18.95 0.55

22.5 23.0 0.50 8.64 0.25 8.48 0.25 I

66.8 67.3 0.50 25.20 0.74 38.80 1.13 JQ VG

81.5 83.5 2.00 4.71 0.14 5.85 0.17 R

ER09-232 46.3 54.3 8.00 7.50 0.22 12.90 0.38 P
incl. 51.8 52.3 0.50 15.05 0.44 20.50 0.60
incl. 52.8 53.3 0.50 60.90 1.78 95.30 2.78

65.2 65.7 0.50 8.17 0.24 10.15 0.30 JQ VG 11

75.5 76.5 1.00 13.73 0.40 16.73 0.49 R
incl. 75.5 76.0 0.50 24.10 0.70 29.20 0.85

ER09-233 55.6 61.1 5.50 12.07 0.35 19.43 0.57 P
incl. 56.6 57.1 0.50 21.60 0.63 23.70 0.69
incl. 57.1 57.6 0.50 41.10 1.20 61.60 1.80
incl. 58.6 59.1 0.50 14.15 0.41 32.70 0.95
incl. 60.6 61.1 0.50 19.00 0.55 30.30 0.88

75.4 77.4 2.00 5.86 0.17 10.00 0.29 JQ VG

ER09-234 76.7 78.7 2.00 8.02 0.23 11.77 0.34 JQ
incl. 77.2 77.7 0.50 16.65 0.49 26.40 0.77 VG 2

84.2 84.7 0.50 6.33 0.18 11.40 0.33 R

93.5 95.0 1.50 4.46 0.13 6.13 0.18 S

ER09-235 82.1 82.6 0.50 17.00 0.50 29.00 0.85 JQ

103.7 104.7 1.00 10.38 0.30 12.53 0.37 S
incl. 103.7 104.2 0.50 13.30 0.39 14.15 0.41

199.1 200.6 1.50 14.27 0.42 23.99 0.70 T
incl. 199.6 200.1 0.50 39.60 1.16 66.70 1.95

ER09-236 151.5 152.5 1.00 25.80 0.75 45.12 1.32 T
incl. 151.5 152.0 0.50 44.10 1.29 81.10 2.37 VG 40+

242.5 243.0 0.50 4.27 0.12 5.21 0.15 T8

ER09-237 179.3 179.9 0.60 5.18 0.15 7.72 0.23 T VG

225.0 225.5 0.50 7.22 0.21 10.85 0.32 T4

235.0 238.5 3.50 7.05 0.21 10.08 0.29 T5
incl. 236.5 237.0 0.50 26.70 0.78 33.20 0.97

244.0 246.5 2.50 5.89 0.17 8.95 0.26 T6
incl. 246.0 246.5 0.50 25.60 0.75 33.30 0.97

249.0 250.5 1.50 8.20 0.24 10.37 0.30 T7
incl. 249.5 250.0 0.50 21.10 0.62 26.70 0.78

274.8 275.8 1.00 0.45 0.01 1.30 0.04 T8 VG 3

ER09-238 236.1 237.1 1.00 5.38 0.16 9.07 0.26 T5

240.1 240.6 0.50 6.22 0.18 12.95 0.38 T6

282.2 283.2 1.00 5.66 0.17 18.70 0.55 T9 VG 4

ER09-239 176.5 189.0 12.50 0.83 0.02 2.02 0.06 T

261.5 266.5 5.00 0.63 0.02 0.99 0.03 T9

ER09-240 37.6 38.6 1.00 8.92 0.26 10.19 0.30 P
incl. 37.6 38.1 0.50 14.70 0.43 16.30 0.48

46.0 47.0 1.00 15.04 0.44 21.83 0.64 JQ
incl. 46.0 46.5 0.50 29.30 0.86 41.00 1.20

ER09-242 207.4 209.9 2.50 1.97 0.06 3.00 0.09 T3

239.5 240.0 0.50 8.89 0.26 16.45 0.48 T5

ER09-243 160.4 160.9 0.50 4.90 0.14 6.02 0.18 S4

181.2 182.7 1.50 2.54 0.07 5.91 0.17 T

216.3 216.8 0.50 42.40 1.24 16.20 0.47 T2

272.9 273.4 0.50 8.66 0.25 18.55 0.54 T7
-------------------------------------------------------------------------
Chemical analysis was completed by ALS CHEMEX Laboratories using a 50-
gram split and gravimetric techniques. The visible gold samples were
mechanically screened and assayed for metallics. Internal standards
provided by an independent company and blank samples were inserted for
quality control purposes. Assay samples are taken from HQ core, sawed in
half along the core axis with one half sent to a commercial laboratory
and the other half retained for future reference.
-------------------------------------------------------------------------
Note: Sample length approximates true thickness. VQTL VG =
Quartz-tourmaline vein with visible gold. VG5+ = five grains
of visible gold were identified in the sample. TE = visible
grains of tellurides.
-------------------------------------------------------------------------


-------------------------------------------------------------------------
Table 2. Eau Claire Gold Deposit 2007-2009 Average composite gold grades
-------------------------------------------------------------------------

Number of Vein Average Grade Length Cut off grade
Intercepts Au g/t Au oz/ton m Au g/t

500 12.4 0.36 1.37 1.7
450 13.6 0.40 1.36 2.4
400 15.2 0.44 1.33 3.3
350 16.8 0.49 1.34 4.2
300 18.4 0.54 1.38 5.0
250 21.0 0.61 1.37 6.1
200 24.6 0.72 1.36 7.8
150 31.3 0.91 1.27 10.4
100 43.0 1.26 1.21 15.0
50 66.4 1.94 1.20 22.2
25 114.3 3.34 1.06 35.6
10 218.6 6.38 1.11 50.0
-------------------------------------------------------------------------

SOURCE Eastmain Resources Inc.

Copyright (C) 2010 PR Newswire. All rights reserved
Bullboard Posts