Dev on drilling, assaysGood clear comment on PLS drilling plans, plus assay results to come, reiterating that there will be lots of news in coming weeks, and big winter drill program after the freeze-up (from blog posting yesterday):
"We have now finished lake drilling until the lake freezes over. However, we haven’t finished the current program altogether. As we announced October 7th we have a number of land-based holes to drill west of the initial discovery zone. The highest priority areas (identified through Radon and geophysics) are between lines 360W and 860W and are considerable step outs. We also have a large number of assays to come back from the labs before the winter drill program kicks off. As you know, we have always been a very aggressive exploration management and technical team – something that has directly contributed to our success over the last three years. Once the lake has frozen over we’ll be implementing an even more aggressive program."
Link to full post: https://www.fissionuranium.com/high-grades-at-r780e-more-assays-and-more-drilling-to-come/