Drill results ??We should get at least 10 holes and will likely have a miss or two as they try to connect 600w to the main deposit. Should be far more pounds in the other holes to cover drill costs and a bunch more. Expect ther will be one or two holes that shareholders of NXE can look at to get a clear vision of what a good high grade hole looks like, not mineralization scattered over zones of more than 300 meters.