Re re Digging deeperThe Arrow estimates have two big issues! - All the good stuff is more than 700 meters down hole. - Estimate is based on drill holes 50m x 50m apart. 15 m is normal to get an accurate estimate. Lots more drilling needed to get the deposit out of the inferred category. Just read the new report that IIroc made them put out. If they have lots of cash to drill why the big rush to issue a report that means nothing.