Re: Penalty $50,000
Re: Penalty $50,000 Per Day Manic 2 Diversion Tunnels 19962
for every day the SIGNED contract runs out of time past SEPT 15 196312:00 PM the contractor PAYS """Hydro QUEBEC Plays
NO games .""""....Contractor Temiskiming Inspiration 20 Machines Drilling The Face 18 Foot Rounds
V Cut Size 25 feet High 50 Feet Wide ..... I doubt very much the boyz on King Street could handle this kind of pressure throw out production numbers just for the fun of it and get away it playing with Hydro Quebec ....Never
The End Result Temiskiming was paid $ 50,000.00 per day Extra for every day ahead of schedule
Stand Proud Steve Roman Harte Gold CEO !.... Some Big Pay Checks for the Time .. First stop Clearwater Beach Florida a sleepy little village at the time !
Pressure .....Try it sometime Steve works wonders Sign a contract finish ahead of schedule ROCK
Granite Trim Tex in the back Holes No loose
Enjoy Mining !