My takeawayJust listened to the presentation:
- - 3 drill holes planned for high priority IP anomalysouth of main zone (Was delayed due to permitting). Main zone has the thickest highest grade ore/vein. Hopefully the continuity of the ore/veinsystem extends south. If it does than we’reeasily looking at another million ounces.
- - 6 drills turning by 20th
-- Mill news is very interesting. Blane knows whathe’s doing and he sounds very connected in Nevada.
-
It all coming together. Still very long.