RidiculousHow people choose to interpret a report. They are not struggling to figure out how to get
copper out of the ground. They are simply working towards optimization of the leaching
process. Optimization means peak efficiency of the process. Tweaking the acid solution
for the carbonate rock to flush out the highest recovery as well as the length of time to
let the acid solution percolate requires testing, time and retesting. These tests should
have already been performed before they started into production, but Covid interferred
with their plans so that testing and optimization are being done now. The've only got 30%
of the field in production so its still early days to get this perfected. I'm willing to accept
that and give them a break before I start being critical of the project and mgmt.