Johnson took over the Prophecy Platinum Prez position. His main focus was the
core wellgreen mine and drilling across this zone of a good 900m with a
mine tunnel that stretches into the central zone ( total 1200m long ). Johnson alsosunk a few drills into the western zone.
Which means.... The 2.5 km resource includes the,
central zone. This info is very hard to find - much of the imagery in press releases still lingering online have broken links. Thus, making it very difficult to piece together the puzzle.
2012 - Drill Plan - From Core mine zone right across and into Central Zone.
200m grid
4 holes per 200m
= 50m spacing ( would 50m spacing be considered
inferred or...
measured ? )
Main Wellgreen Mine zone = East Zone Previous post i mentioned,
if one was standing at wellgreen mine and was lokking towards central zone
and marked the edge between wellgreen main zone with central, what would
it be ? Far east of the East main zone.
But...since it's headed towards central and westerly, would it be logical to
call it far east ? No, not at all.
Same as a few wellgreen maps have extreme east zones and far east.
Well outside the main wellgreen.
What did i find ?
Johnson pinpoint of, Far East Zone. Tucked away on a lingering press release online.
My concept was correct, on how to precieve where far east would be,
but it was opposite direction - still with in the original east zone.
Go figure.
We can now gain insight into how Johnson division the zones.
FW - far west
W - westerly
C - central
E - east zone ( main mine )
FE - far east zone - stops at quill creek -
Q - quill creek zone
= This makes sense. Original East Zone = East ( mine area )
+ Far east ( to Quill Creek )
Hmmm....those
other maps that show
east and far east beyond quill creek now called burwash made it very difficult to understand the entire wellgreen.
Like this map in link, showing east side beyond the Quill Creek.
Grrrrrrr.
https://live.staticflickr.com/65535/53233499245_3e788493a5_z.jpg VISUALIZE Johnson's 750+ m drill hole near 2/g t Pt Eq - only 350m from main mine He tapped 3 other holes in this same area - next best - 437.6m Notice how wide the mineralization is in image below. Anorher hole lower of the 756m hole
would define the downdip all the more. Didn't ncp say during covid....they'd drill Quill ? I don't recall any follow up press release with results, anyone else ?
Notice the total distance from Central to Johnson'e prized 750+m hole.
Strike 1,050m Central's massive intercept's - WS 11 188 - 457m intercept
WS 12 214 - 362m intercept
All drilled - East + Central refer to first image of 2012 drilling across east + central ( top )
50 m spacing.
Johnson, did everything correct. All but....
being the initiator of,
dividing the mineral geology. Which has caused issues with extraction. Whereas, next prez after, Johnson recognized phase 1 success,
Phase 1 went with lower hole ores.
Phase 2 used upper peridotites.
Resulting in - near 75% less recovery seen in metal payables 2023
2023 PFS also assigned the extractable recoveries to the block modelling.
What do we really have if... proper extraction was used ?
2017....x - ing out 86% inferred resource.
Hmmmmmm.
Yet....XPS has no issues with, olivine, dunite, serp, peridotite in Timmins.
Solution, use another extraction company.
That can handle such ores.
Everything changes.
Why would anyone change up president's especially when Johnson
was hitting home run intercept's ?
Hello.
co
Beast System... 1,050 strike all drilled
Central to Johnson hole
549m deep intercepts inside the mine.
756m record drill only few hundred meters away from main mine.
WTH...was the junior thinking pissing away years on, west drilling ?
Lastly,
do take notice of Johnson's far east image.
Anyone see anything on the north side ?
Says....north arm targets.
But other images show... many dots in this area, as if it were drilled ?
Expand this image - North side of Wellgreen Deposit
one will see the
elongated north arm all in red - with
several black drill hole dots ?
Cheers...