Drill results ??Overall deposit size unchanged at 645 x 215 m. High grade zone 325 x 215 m. They keep on drilling and the deposit size stays the same. All over 600 meters down. Somebody needs to explain why they keep drilling in the same small zone. They have a pile of claims not even touched !!