Re Re Re NewsJust trying to bring some facts into the discussion that pumpers choose to ignore. Last drill report records total deposit size 645m x 235m and the other number is never reported. It is in most every report I have ever read but not here.
Hole 15-61c2 21.2 of high grade in 185.5m section. down to 841m
Hole15-61c1 5.8 m of high grade in 139m section down to 823m
Hole 15-59c4 8.95m high grade in in 376m section down to 877m
Hole 15-59c3 2.85 m high grade in 384m section down to 872m
All drilling to date is inside the small area outlined above with numerous high grade sections down to nearly 900 m. How do you mine this at a profit ? How do you come up with 300 to 400 million pounds of U308. Complete fantasy !!!