Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Suncor Energy Inc. T.SU

Alternate Symbol(s):  SU

Suncor Energy Inc. is a Canada-based integrated energy company. The Company's segments include Oil Sands, Exploration and Production (E&P), and Refining and Marketing. Its operations include oil sands development, production and upgrading, offshore oil and gas production, petroleum refining in Canada and the United States and its Petro-Canada retail and wholesale distribution networks, including Canada’s Electric Highway, a coast-to-coast network of fast-charging electric vehicles (EV) stations. Petro-Canada has a network of over 1,800 retail and wholesale locations across Canada, providing customers with a wide variety of fuel and service offerings including low-carbon fuel options. It is developing petroleum resources while advancing the transition to a low-emissions future through investment in power and renewable fuels. It also wholly owns the Fort Hills Project, which is located in Alberta's Athabasca region, approximately 90 kilometers north of Fort McMurray.


TSX:SU - Post by User

Comment by mrbbon Nov 11, 2023 3:45pm
55 Views
Post# 35730384

RE:RE:As Usual, Quebec Is The NASTY BREED Of GREED ! LOL !

RE:RE:As Usual, Quebec Is The NASTY BREED Of GREED ! LOL !
ztransforms173 wrote:
Hydro-Quebec

Electricity Rates

Effective since April 1, 2023

pages 70-71


SECTION 10 – EXPERIMENTAL RATE BR

Application 4.43

Rate BR is an experimental rate for charging stations. It applies to a contract for electricity delivered for the purpose of supplying one or more direct-current electric vehicle charging stations rated 400 volts or more. The electricity may also be used to supply one or more 240-volt stations, at the customer’s discretion.

Definition 4.44

In this section, the following definition applies: “load factor”: The ratio, expressed as a percentage, of energy consumption to the product of maximum power demand and the number of hours in the consumption period.

Structure of Rate BR 4.45

The structure of monthly Rate BR for an annual contract is as follows:

12.221¢ per kilowatthour for consumption associated with the first 50 kilowatts of maximum power demand, that is, the product of the maximum power demand up to 50 kilowatts, the load factor and the number of hours in the consumption period,


plus

22.902¢ per kilowatthour for consumption associated with the maximum power demand in excess of 50 kilowatts, that is, the product of the excess power demand, the load factor up to 3%, and the number of hours in the consumption period, plus 18.010¢ per kilowatthour for the remaining consumption. The minimum monthly bill is $13.648 when single-phase electricity is delivered or $40.944 when three-phase electricity is delivered.

Terms and conditions of application 4.46

If several direct-current charging stations rated 400 volts or more and belonging to the same customer are installed at the same site, they must come under a single contract. The customer must undertake to supply Hydro-Qubec with non-identifiable data from all charging stations covered by the contract under this rate, such as duration, energy consumption and power demand for each charge, at an agreed-upon frequency. If the customer fails to comply with this undertaking, the contract ceases to be eligible for Rate BR and becomes subject to the appropriate general rate. Subject to all applicable legislation, Hydro-Qubec undertakes to keep confidential all information provided by the customer for the purposes of this rate and identified by the customer as confidential.

Mixed use 4.47

When the electricity is not used exclusively for the purpose of supplying electric vehicle charging stations, this rate applies on condition that the installed capacity for other purposes does not exceed 10 kilowatts. If the installed capacity for other purposes exceeds 10 kilowatts, the appropriate general rate applies.

Installation of a maximum-demand meter 4.48

Hydro-Qubec installs a maximum-demand meter for all Rate BR contracts in order to measure the maximum power demand.


https://www.hydroquebec.com/data/documents-donnees/pdf/electricity-rates.pdf?v=20230401

***

- the PROPOSED NEW electricity rates for EV chargers are MUCH HIGHER than the PRESENT RATES {RATE BR}

- the electricity rates for DOMESTIC CONSUMTION (RATE D) is 6.509 CENTS for the FIRST 40 KWH during the day and 10.041 CENTS  for MORE THAN 40 KWH per day

- it is VERY PROFITABLE for Hydro-Quebec to SUPPLY ELECTRICAL POWER to the EV chargers

- you are being TAKEN TO THE CLEANERS NOW

- imagine, in a few years time; when you are a CAPTURED CONSUMER; they will REALLY STRIP YOU OF YOUR WEALTH

- KNOW YOUR ENEMY


z173


that's why quebec hated oil/gas and alberta that compete with quebec's monopoly on hydropower production. Screwing their own citizen on hydropower is not a surprise, quebec is run by mobsters.  

Corruption inquiry witness: Mafia controlled province's largest construction union | CTV News

14 highlights from Quebec’s corruption inquiry | Globalnews.ca


<< Previous
Bullboard Posts
Next >>