morning chit chat3.20 copper holding.
Things material. Dewater cost. Why 10 million? It would seam proper 2 build 1 kilometer of pipeline to granit. 4 inch 5000 psi. A million should be plenty.
A 600 gallon per min tripex pump. Almost free with oilpatch stoped. Six gal per hr. diesel.
1 day displacement 600 time 60 times 24 equals 1 million gallons per day.
Volume guess is less than 10 million cubic feet or 65 million gallons.
That is 65 days at 1000.00 per day cost.
Tko only pays 75%.
Must b something different happening.
Moly is now about 3 million less per q than older qs. So no profit to down c1.
Hopefully we hit 32 million pound production.
Looking 4 florence news.