RE: Secondary too cheap, PMGThought PMG could easily have waited, until two more Corcel delineation wells were drilled, and the Sept. Conga well was done. IMO, waiting another 6 months to do a PP, at a much higher, and less dilutive, price, would have been a better strategy. I don't want just one more rig at Corcel ; for C$50 million, we'd better see two added. Three rigs, full time at Corcel, over the next 12 months, could easily drive Corcel production alone, to the 25,000 BOD range, assuming the "large structure" that Corcel-1 drilled into, proves out. I too, would like to add, in the C$12.05 range.