RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:Artemis Phase 2 NPV released, can VGCX do the same.@OCB1234
Rave is just a little bit of drive away.You can tell that from Google Map . It is no that hard.
it seems there is more sulphide in the surrounding ore body. They might switch from heap leach to conventional grinding circuit. At least that was the rumour.
There is nothing in Raven except poking holes
There is no way they are ever going to make it to 200 oz. There is two possibilities, the mint people messed up terribly, they paid VGCX more weight than they are suppose to. Or they did a complete rennovation on the crusher building. There is no way they are going to make it. There is no enough drive on their overland conveyor to run that much throughput so it is one of the main bottlenecks. They can do some sieving which could reduce the fine content going throught the crusher circuit which translate to the big steel staying alive a bit longer.