Condensate ratio in Ina equal to Bati Gurgen shallow Bati Gurgen-1 Well
The Bati Gurgen-1 exploration well (Valeura 100% working interest) was drilled to a measured depth of 2,735 metres into the top of the Teslimkoy member of the Mezardere formation and was cased to a measured depth of 2,729 metres. Log analysis indicated 32 metres of aggregate net gas pay at an average porosity of 19.6% in multiple stacked sands in the Danismen and Osmancik formations. The well also penetrated several over-pressured, thinner and tighter stacked sands in the Mezardere formation.
The main completion program consisted of perforating approximately 13 metres of conventional stacked sands in the Osmancik formation below 1,480 metres and carrying out a 24-hour production test. Over this period, 3,448 Mcf of natural gas, 15 barrels of condensate and minimal water were produced at a stable restricted rate of approximately 3.4 MMcf/d through a 36/64ths inch choke and a final flowing wellhead pressure of 1,307 pounds per square inch