RE:RE:RE:About time for the NR that says we have 12 drills on site,YetAnother1 wrote: flashcash wrote: YetAnother1 wrote: Anyone know how long it takes to get a rig and manpower on site?
They are very efficient with the number of drill rigs on site at the moment.
I think 80 km for area 51 and the taby/Can zones and a potential 2 to 5 million Oz deposit there.
There will be a significant increase in the number of drills
56 plus I think around 30 million in cash is a crazy amount of drilling !
Something else is up, mine start up and I think a mill could be bought.
At the moment transport to the toll mill is I think about 1g/t, so if they want to be a 100 k oz producer it would cost them around 15 million just to transport the ore per year at 12g/t
GLA