Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

WESTERN POTASH CORP T.WPX

"Western Potash Corp is engaged in the acquisition, evaluation, and exploration of mineral properties containing potash in Western Canada. The Company holds interests in the Milestone Project located in Southern Saskatchewan."


TSX:WPX - Post by User

Bullboard Posts
Post by more2comeon Dec 14, 2011 2:02pm
539 Views
Post# 19322110

KRN/WPX Opex + Resource

KRN/WPX Opex + Resource

KRN:

Estimated Annual (OPEX)  ca. 129 - 132 p.t. kci

recoverable kci ca. 221 million t. in total


Description 625K Facility
($ millions)/yr
Per Tonne KCl
($/tonne)
2.125 M Facility
($ millions)/yr
Per Tonne KCl
($/tonne)
Personnel 6.84 10.95 16.22 7.63
Natural Gas 29.37 46.99 99.85 46.99
Electricity 9.70 15.53 32.99 15.53
Brine Field Expansion 20.70 33.12 70.38 33.12
Maintenance & Spare Parts 7.83 12.54 26.64 12.54
Blanket Oil Replacement 3.99 6.38 13.57 6.38
Other 4.61 7.36 14.90 7.01
Total OPEX 83.04 132.87 274.55 129.20

Summary of Reserve and Resource Update

Based on the Technical Report, 144 million tonnes of potash product canbe extracted and produced from the Project's reserves at 97% KCl and90% plant efficiency, which suggests a project life of 68 years at aproduction rate of 2.125 million tpy.

The Technical Report has reclassified most of the "Measured Resources"and "Indicated Resources" to "Proven Reserves" and "ProbableReserves".  These resource areas have been reduced by the definition oftechnical exclusion areas where mining should not take place to avoidproblems at the surface due to potential subsidence.  Proven Reserveshave been estimated by placing caverns over the license area in grid asdefined by the mining method. For each drill hole, a typical cavernrecovery of mineralized material at a given grade has been estimated.This amount has been reduced by 10% to account for any anomalies belowthe 3D seismic resolution. Reserves were estimated by calculating thenumber of caverns in the Measured and Indicated Resource areas for eachdrill hole and multiplying by the typical cavern recovery.  The resultsfor Proven and Probable Reserves are as follows:

Proven Reserves Mineralized Material
(million tonnes)
Average KCl Grade
(% KCl)
Mineable KCl Tonnage
(million tonnes)
Total Average Carnallitite 261.6 18.7 49.0
Total Average Sylvinite 52.7 26.3 13.9
Total 314.3 62.9
Probable Reserves Mineralized Material
(million tonnes)
Average KCl Grade
(% KCl)
Mineable KCl Tonnage
(million tonnes)
Total Average Carnallitite 416.0 18.5 77.0
Total Average Sylvinite 58.3 25.8 15.0
Total 474.3 92.0

In addition to the Mineral Reserves, the Technical Report provides anestimate of the "Inferred Resources".  It cannot be assumed that all orany part of the Inferred Resources will be upgraded to an Indicated orMeasured Resources due to additional exploration.  Inferred Resourceshave not been considered in the FS as they are considered toogeologically speculative.

Inferred Resources Mineralized Material
(million tonnes)
Average KCl Grade
(% KCl)
Mineable KCl Tonnage
(million tonnes)
Total Average Carnallitite 1320 13.8 50.2
Total Average Sylvinite 298 17.8 15.9
Total 1618 66.1

--------------------------------------------------------------------------------------------------------------------------------------------------------------

wpx:

Target Annual Production rate    2.8 Mt/yr

OPEX    $62.35 CAD/tonne (+ Transport ca. 40-45 bucks = ca. 107-108 )

recoverable kci ca. 942 million t. in total 

Table 1. Measured Mineral Resource within Crown and Leased Freehold Areas Only*

Bed Average KCL
Grade (%)
In-Place
Tonnage (Mt)
In-Place KCL
Tonnage (Mt)
KCL
Resource**(Mt)

Patience Lake

28.66 314.27 90.06 29.60

Belle Plaine

30.13 131.70 39.68 13.04

Esterhazy

33.71 190.71 64.28 21.13
Total 30.47 636.68 194.02 63.77

* Search Radius of 800 m used; Mt = million tonnes; K2O grade > 15%; Density = 2.08, KCl = 1.58303 K2O.
** Resource accounts for geologic anomalies (5%), and extraction ratio (34.6%).

Table 2. Indicated Mineral Resource within Crown and Leased Freehold Areas Only*

Bed Average KCL
Grade (%)
In-P  lace
Tonnage (Mt)
In-Place KCL
Tonna      ge (Mt)
KCL
Resource**(Mt)

Patience Lake

28.60 930.41 26 6.09 83.78

Belle Plaine

29.97 391.00 117.20 36.90

Esterhazy

33.66 536.03 180.44 59.31
Total 30.35 1,857.45 563.731 179.99

* 8.0 km radius used; Mt = million tonnes; K2O grade > 15%; Density = 2.08, KCl = 1.58303 K2O.
** Resource accounts for geologic anomalies (25%), extraction ratio (34.6%).
** Resource accounts for geologic anomalies (9%), extraction ratio (34.6%).

Table 3. Inferred Mineral Resource within Crown and Leased Freehold Areas Only*

Bed Average KCL
Grade (%)
In-Place
Tonnage (Mt)
In-Place KCL
Tonnage (Mt)
KCL
Resource**(Mt)

Patience Lake

28.68 4,349.59 1,247.56 323.74

Belle Plaine

29.88 2,030.82 606.71 157.44

Esterhazy

33.47 2,526.82 845.61 219.44
Total 30.31 8,907.24 2,699.89 700.62