Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Bullboard - Stock Discussion Forum Traverse Energy Ltd TVETF

Traverse Energy Ltd is a Canada-based company. The Company is engaged in oil and gas exploration, development and production activities. It conducts its operations in the province of Alberta. The Company’s assets are located in the Carbon, Turin and Greater Coyote areas of Alberta as well as in the Duvernay land base located in the Buffalo Lake, Chigwell and Pigeon Lake areas of Alberta. The... see more

GREY:TVETF - Post Discussion

Traverse Energy Ltd > TVL's Duvernay: 650 boepd (top quartile for ED oil wells)
View:
Post by stockfy on Mar 15, 2018 6:29am

TVL's Duvernay: 650 boepd (top quartile for ED oil wells)

TVL's first Duvernay result could not be more promising. 650 boepd which is among the top quartile for East Duvernay oil wells, as quoted below, so the well was placed on production on December 21, 2017.

Traverse Energy Ltd. Updates Duvernay Shale Basin Activity
V.TVL | 5 days ago
CALGARY, Alberta, March 09, 2018 (GLOBE NEWSWIRE) -- Traverse Energy Ltd. (the “Corporation”) (TSX Venture:TVL) provides an update on its Chigwell Duvernay well (102/03-32-042-24W4) drilled in October 2017. 
 
The Corporation’s Duvernay horizontal well (100% working interest) was completed in late November and early December 2017. The well was completed utilizing the plug and perforate stimulation process. A horizontal length of 2,172 meters was stimulated with sand placed at a 1.6 tonnes per meter concentration. A total of 257,900 barrels of water were used during the completion.
 
The well was flowed for clean-up and subsequently equipped with artificial lift and production facilities to facilitate the efficient recovery of completion fluids. The well was placed on production on December 21, 2017.
 
In early January, the production fluid began to show oil recovery with a gravity of 33o API. For the months of January and February 2018 the well produced 2,128 barrels of oil and 36,042 barrels of load water with an average oil cut of 5.6%. Total load water recovered to February 28, 2018 was 40,325 barrels, which is 15.6% of the completion fluids. The production fluid rate for the last 14 days was 650 barrels per day. To date, total fluid recovery has been limited by artificial lift capacity. Oil cuts remain in the same range as the previous months.
 
The Corporation is encouraged by the fluid recovery rate which is among the top quartile for East Duvernay oil wells. Management’s assessment is that the fluid rate is indicative of the rock quality obtained from the open hole logs and rock samples collected in the horizontal section. Continued production is required to fully evaluate the oil productivity of the well.
 
Additional information on the Duvernay shale basin area can be found in our corporate presentation on our website at www.traverseenergy.com
 
The Corporation is a junior oil and natural gas exploration and development company. The common shares of the Corporation are currently listed on the TSX Venture Exchange under the trading symbol “TVL”.
 
 
Comment by 07wildwood on Mar 16, 2018 2:22pm
Not boes per day. Production fluid rates. Oil cuts 5.6 percent of that. Less than 40 bps/d
The Market Update
{{currentVideo.title}} {{currentVideo.relativeTime}}
< Previous bulletin
Next bulletin >

At the Bell logo
A daily snapshot of everything
from market open to close.

Dealroom for high-potential pre-IPO opportunities