!!! TSX-V: B BCM Resources WATCH LIST !!!So much coming. This could be EYE OPENING Let by this TEAM. Looking forward to the next few months now that Merger is done. 100% OWNED
Full Merge 100% OWNED BCM Resources
Fall drilling reports
READ THIS PRESENTATION AND RESULTS FROM Sergei
Dr. Sergei Diakov, MSc, Economic Geology, Post Graduate Degree Geology and Exploration of Mineral Deposits, PHD Economic Geology RPFU, Moscow, Russia
TK Drilling Highlights • BCM Resources completed two phases of drilling at Thompson Knolls with TK1 in Phase I and TK2, 3, 3a, 4, 5 and 6 in Phase II drilling • The overall amount of drilling completed so far reached 16,968 feet with an average drillhole depth of 2,424 feet • The deepest holes are TK3a and TK6 extended relatively to 3,652-feet and 3,930- feet depths • TK6 delivered most significant skarn intercept ever encountered on the project • Below is a brief summary of the preliminary core logging results including field measurement on core by Niton XL5 Plus gun • Assay samples from earlier drill holes arrived and being processed. Assay samples from TK6 have been collected from all mineralized intervals and dispatched to ALS for analysis. Assay results are pending. Complete set of assay results from Phase II will be reported in due course • Additional drilling is planned on the project in Phase 3 drilling program that will be implemented in the forthcoming fall.
Source https://bcmresources.com/investors/presentations/