RE:RE:RE:Eastern well results. The 11-09 pad is operated by PIPE and its wells are drilled thru the acreage owned by PIPE. Including the well drilled in 2018 awaiting tie-in.
The wells on the low working interest acreage are all gathered and connected to SDE battery. PIPE's interest in that acreage is very low, I believe single digits. SDE is showing it as its own.