Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

CanAsia Energy Corp V.CEC

Alternate Symbol(s):  CECAF

CanAsia Energy Corp. is a Canada-based junior oil and gas company. The Company is engaged in the exploration for, and the acquisition, development and production of, crude oil and natural gas reserves. The Company, through its subsidiary, Andora Energy Corporation, is focused on developing the bitumen resources at the Sawn Lake property using steam assisted gravity drainage (SAGD) development. The Company has working interests in, four heavy oil sand leases with 27 sections (24.25 net sections) of Sawn Lake Alberta Crown oil sands leases within the Alberta Peace River Oil Sands area. In the Sawn Lake Central area, it operates with a 100% working interest in two oil sands leases with 11 gross sections (8.25 net sections). In the Sawn Lake South area, it operates with a 100% working interest in three oil sands leases with 16 gross sections (16 net sections).


TSXV:CEC - Post by User

Bullboard Posts
Post by zorgon1on Jan 06, 2009 9:57am
866 Views
Post# 15684912

Operational update

Operational update
Pan Orient Energy Corp.: Thailand Operations Update

07:00 EST Tuesday, January 06, 2009

Print this article

CALGARY, ALBERTA--(Marketwire - Jan. 6, 2009) - PAN ORIENT ENERGY CORP. (TSX VENTURE:POE) -

NOT FOR DISSEMINATION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.

THAILAND

NSE-E2 appraisal well (60-per-cent working interest and operator)

The NSE-E2 appraisal well, targeting potential volcanic reservoirs approximately 365 meters south east of the NSE-E1 discovery well, failed to encounter the main volcanic objective, which had been faulted out at this location, but encountered a deeper oil stained volcanic target approximately 25 meters thick. Testing of this deeper potential volcanic reservoir is anticipated to commence shortly.

NSE-D2ST1 appraisal well (60-per-cent working interest and operator)

The original NSE-D2 appraisal well encountered the top of the main volcanic reservoir at a depth of depth of 754 meters true vertical depth (TVD) approximately 330 meters north of the NSE-D1 location. Approximately 34 meters of highly fractured volcanic reservoir was drilled with mud losses of approximately 1,200 barrels. The well was put on test, flowing mainly gas with some oil, suggesting close proximity to an interpreted gas/oil contact. A first side track (NSE-D2ST1) encountered the main volcanic reservoir approximately 30 meters structurally lower than in the original well bore and was believed to be below the gas/oil contact. Severe losses were encountered indicating good fractured reservoir is present. Subsequent testing confirmed that the volcanic reservoir encountered at NSE-D2ST1 is also above the gas/oil contact. A second sidetrack, NSE-D2ST2, is about to commence drilling in the next few days after the rig has been moved on location from the NSE-E2 well pad, once again targeting a deeper oil leg in the reservoir.

L44-V appraisal well (60-per-cent working interest and operator)

The L44-V appraisal well was drilled from a surface location approximately 1.3 kilometers south west of the Bo Rang-1 gas discovery. L44-V targeted a potential down dip oil leg within a volcanic reservoir that tested 5.5MMcfg/d at the structurally higher Bo Rang-1 well, which was drilled by an earlier operator of the L44 concession area. The main volcanic objective was encountered at a true vertical depth (TVD) of approximately 720 meters and penetrated an approximately 55 meter thick volcanic section that had oil shows and very high mud gas spikes of up to 33%, exhibiting both heavy (C5) and light (C1) hydrocarbons. A shallower secondary volcanic objective was also encountered at a depth of approximately 500 meters TVD with mud losses while drilling of approximately 100 bbls in combination with a minor gas kick. Testing of the lower and possibly the upper volcanic targets is anticipated to commence shortly. Upon completion, results will be announced.

L44-CD1 appraisal well (60-per-cent working interest and operator)

L44-CD1, located approximately 1.15 kms north of the POE-6 fault compartment sandstone discovery well, will attempt to establish oil production from a volcanic reservoir that underlies the shallower oil producing sandstone reservoirs in the Wichain Buri and POE-6 oilfield areas. These areas are approximately 15 kms northwest of existing volcanic reservoir production at Na Sanun East. The well will be targeting the main volcanic reservoir at a subsurface location 370 meters due west and approximately 200 meters up dip of the previously drilled L44-C vertical well that encountered oil and gas shows in the main volcanic target, but tested water. Drilling is anticipated to commence shortly, once the rig has completed moving from the L44-V location.

Thailand Production

Thailand production exited 2007 at 13,446 bopd gross (8,067 bopd net to Pan Orient). This is below the year end 2008 exit target of 15,000 bopd (gross), 9,000 bopd (net), due mainly to NSE-D2ST1 once again encountering the gas cap, and a year end focus on potential new reserves drilling at NSE-E2 and Bo Rang (L44-V) as opposed to further NSE central development drilling. At year end, two wells awaited testing (NSE-E2 and L44-V), that in the success case would result in incremental production. The year end exit production rate of 8,067 bopd, net to Pan Orient, was an increase of 3,657 bopd, or 83%, over the 2007 exit rate of 4,410 bopd. The Company continues to focus on production growth in combination with establishing new reserves that would enable production to be maintained and grow through 2009.

Pan Orient is a Calgary, Alberta based oil and gas exploration and production company with operations currently located onshore Thailand, Indonesia and in Western Canada.


45,568,366 common shares issued

FOR FURTHER INFORMATION PLEASE CONTACT:

Pan Orient Energy Corp.
Jeff Chisholm
President and CEO
(403) 294-1770
or
Pan Orient Energy Corp.
Jason Bednar
Vice President Finance and CFO
(403) 294-1770
Email: jason@panorient.ca
Bullboard Posts

USER FEEDBACK SURVEY ×

Be the voice that helps shape the content on site!

At Stockhouse, we’re committed to delivering content that matters to you. Your insights are key in shaping our strategy. Take a few minutes to share your feedback and help influence what you see on our site!

The Market Online in partnership with Stockhouse