RE:TECK forced into a corner by CUU Oh Ericeverision.... you are gettin a iddy biddy dreamy with that poste.
FORCED INTO A CORNER??? It could be Copper fox metals inc forced into a corner. New 2019 studies about stuides could be not to shiny and BOTH or Copper fox metals don't see value in putting out the numbers.
You ASSUME a lot of pumpy stuff their. BUT nobody expects economics to improve that much. Same deposit. Same grades. Same remote location with long long road and huge bridges and big camp and airport and stuff. $100 CAD cost in 2012 is now $112 today with inflation.
Soo... a 2012 $4 BILLION project like Schaft Creek jumpz to $4.48 Billion today. Metal prices are way way south of the 2013 FS prices used in study. Current glut of copper.
Teck has the reins. Teck alone makes PRODUCTION DECISION. Teck is NOT worried about 7 cent Copper fox metals getting to pricey.
I think you are reading only what you want to see and ignorin what the alternative singel mite be.
Have the BEST day!!! ^_^