RE:Thoughts on Building Position in SKP and DECNot difficult, watch the strikes on Red Cliff, twice or three times and your choice becomes obvious. It is not pumping but it is concrete, which would propel any title to more than $$. Dec is a rare godsend that won't be for long, with the whole area heating up.
Select drill intersections in the drilling include the following:
MONTROSE ZONE |
DDH No. | From | To | Core Length** | Gold g/t |
2009-MON-6 | 53.66 | 108.84 | 55.18 | 9.64 |
2009-LC-17 | 122.56 | 128.56 | 6.71 | 10.42 |
2010-MON-28 | 57.16 | 75.61 | 18.45 | 49.20 |
2010-MON-31 | 60.37 | 86.38 | 25.91 | 10.94 |
2011-MON-2 | 173.17 | 186.13 | 12.96 | 10.06 |
2011-MON-9 | 121.71 | 140.61 | 8.90 | 28.10 |
2011-MON-11 | 138.57 | 146.04 | 7.47 | 43.74 |
2011-MON-27 | 102.90 | 133.54 | 30.64 | 14.52 |
2011-MON-37 | 66.68 | 75.0 | 8.32 | 16.50 |
2012 –MON-3 | 67.07 | 71.34 | 4.27 | 62.38 |
2012 –MON-24 | 87.80 | 98.78 | 14.02 | 14.86 |
2012 –MON-61 | 173.93 | 208.99 | 35.06 | 7.83 |
2017-MON-5 | 311.28 | 315.40 | 4.12 | 19.9 |
MON-2018-45 | 211.89 | 215.24 | 3.66 | 8.94 |
MON-2018-50 | 243.96 | 249.09 | 5.12 | 16.56 |
MON-18-56 | 236.13 | 240.24 | 4.12 | 8.59 |
** True width is believed to be 70 % of intersection length.
WATERPUMP ZONE |
DDH No. | From | To | Core Length** | Gold g/t |
2017-MON-38 | 73.38 | 80.85 | 7.50 | 13.88 |
2017-MON-40 | 88.41 | 116.46 | 22.87 | 10.41 |
MON-2018-19 | 161.04 | 168.29 | 7.26 | 10.60 |
https://decaderesources.ca/projects/red-cliff-property/