TSXV:EML - Post Discussion
Post by
Betteryear2 on Jul 13, 2023 5:02pm
Electric Metals Continuity of Manganese Mineralization
Drilling highlights from the most recent drill core assays1:
- 33.9 metres of 17.93% Mn (23.2% MnO) from 58.2m including 5.39m of 42.5% Mn (54.9% MnO) from 62.9m
- 30.1 metres of 18.2% Mn (23.5% MnO) from 106.1m including 3.05m of 48.6% Mn (62.7% MnO) from 109.12m
- 13.0 meters of 18.9% Mn (24.4% MnO) from 119.6m 30.5 meters
These holes extend previously drilled manganese along-trend and at depth.
TORONTO, ON / ACCESSWIRE / July 13, 2023 / Electric Metals (USA) Limited ("EML" or the "Company") (TSXV:EML)(OTCQB:EMUSF) is pleased to announce recent assay results of the current drill program at the high-grade Emily Manganese Project ("Emily Project"), Minnesota, USA. The Emily Project is located in the Cuyuna Iron Range of central Minnesota, USA, an area with a rich mining history and support from established local infrastructure, a skilled mining workforce and abundant power and gas.
Electric Metals Announces Continuity of Manganese Mineralization and Further High-Grade Intercepts up to 48.6% Mn (62.7% MnO) from Drilling at the Emily Manganese Project, Minnesota, USA (accesswire.com)
Be the first to comment on this post