2020 Diamond DrillingDiamond drilling executed on Mining License ML215 will first test the strongest EM conductor C1 on Grid 1 (Fig 2 & 3). Drill holes will initially be spaced 40 metres apart testing each of the five conductors delineating the extent of the graphite mineralization proximal to past mining activities. Two holes per drill set up will initially be completed targeting 20 metres below the overburden, with the second hole drilled steeper to intersect 40 metres below the first hole. Subsequent infill drilling, based on delineation results, are to be drilled on 20 metre centres between the 40 metre spaced holes both along strike and at depth (down dip).