Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

GT Resources Inc V.GT

Alternate Symbol(s):  CGTRF

GT Resources Inc., formerly Palladium One Mining Inc., is a Canada-based mineral exploration and development company. The Company is focused on discovering critical green transportation metals. It targets district scale, nickel-copper sulfide and platinum-group-element (PGE) deposits in Canada and Finland. The Company’s Canada projects include Tyko, Ontario; Disreali, Ontario; Canalask, Yukon; Hemlo East, Ontario; Big Lake, Ontario; North Rock, Ontario; and Black Bear, Ontario. The Lantinen Koillismaa (LK) Project in north-central Finland, is a PGE-copper-nickel project that has existing NI43-101 Mineral Resources. The project is located in north-central Finland, approximately 40 kilometers (km) north of the Company’s exploration office in the town of Taivalkoski. The property is 160 km (by road) east-southeast of Rovaniemi and 190 km northeast of the port city of Oulu. The Tyko and Canalask high-grade nickel-copper projects are located in Ontario and the Yukon, Canada, respectively.


TSXV:GT - Post by User

Post by frankmanon Aug 11, 2020 9:44am
39 Views
Post# 31391958

News Palladium One Intersects in new target zone

News Palladium One Intersects in new target zonePalladium One Intersects 166.7m at 1.16 g/t Palladium Equivalent ("Pd_Eq"), Including 63.4m at 1.88 g/t Pd_Eq in Kaukua South at the Open Pit Lantinen Koillismaa ("LK") PGE-Cu-Ni Project, Finland

Vancouver, British Columbia--(Newsfile Corp. - August 11, 2020) -  Palladium One Mining Inc. (TSXV: PDM) (FSE: 7N11) (OTC Pink: NKORF) (the "Company" or "Palladium One") is pleased to report the results of the first drill hole to test the eastern extension of the greater than 4 kilometer ("km") long Kaukua South Induced Polarization ("IP") chargeability anomaly (LK20-006). Hole LK20-006 intersected 166.7m @ 1.16 g/t Palladium Equivalent ("Pd_Eq")*, including 63.4m @ 1.88g/t Pd_Eq.

LK20-006 is located in an area with no previous drilling and represents a 180 meter step-out east of the nearest Kaukua South drill hole (KAU08-036, Figure 1). The results confirm that the eastern extension of the Kaukua South IP anomaly is the result of near surface palladium-rich sulphide (PGE-Cu-Ni) mineralization, which suggests significant additional open-pit style mineralization remains to be delineated in the greater Kaukua area.

Highlights:

  • 166.7m @ 1.16 g/t Pd_Eq, from 43.8m down hole in hole LK20-006
    • Total platinum-group elements (Pd + Pt + Au), 0.58 g/t
    • Individually by metal, 0.39 g/t Pd; 0.14 g/t Pt; 0.05 g/t Au; 0.09% Cu and 0.10% Ni
      • Including 63.4m @ 1.88 g/t Pd_Eq
        • Total PGE of 1.06 g/t,
        • Individually by metal, 0.72 g/t Pd; 0.26 g/t Pt; 0.08 g/t Au; 0.13% Cu and 0.14% Ni
      • Including 7.8m @ 2.61 g/t Pd_Eq
        • Total PGE of 1.59 g/t,
        • Individually by metal, 1.12 g/t Pd; 0.38 g/t Pt; 0.09 g/t Au; 0.13% Cu and 0.19% Ni
  • Confirms the eastern extension of the greater than 4 kilometer long Kaukua South IP anomaly is the result of PGE-Cu-Ni sulphide mineralization (Figure 1)
  • LK20-006 is 180m east of and significantly higher grade than the nearest Kaukua South hole
    • 52.0m @ 1.01 g/t Pd_Eq (0.46g/t PGE), 0.30 g/t Pd, 0.11g/t Pt, 0.05 g/t Au, 0.10% Cu and 0.09% Ni, in hole KAU08-036.
  • The core zone (63.4m @ 1.88g/t Pd_Eq) in LK20-006 is twice as wide as best historic intercept in Kaukua South.
    • 33.0m @ 1.89 g/t Pd_Eq (1.05 g/t PGE), 0.74 g/t Pd, 0.24 g/t Pt, 0.07 g/t Au, 0.17% Cu, and 0.13% Ni, in hole KAU08-035.

President and CEO, Derrick Weyrauch commented, "To date, Hole LK20-006 bears the most significant results of the Phase 1 drill program. It is hard to understate the importance of this hole, as it has not only confirmed the eastern extension of the Kaukua South Zone, but intersected a core zone twice as thick as the next best intersection in Kaukua South. Significantly, the mineralization begins only 43m down hole, making it highly amenable to open pit mining. This confirms our belief that Kaukua South has the potential to quickly add tonnes to the 2019 NI43-101 open pit constrained Kaukua resource estimate."

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/6502/61308_a57a7bd9341a390b_001.jpg

Figure 1: Greater Kaukua Area showing IP chargeability anomalies, note the location of LK20-006 and potential >5.5km strike of the Kaukua South Anomaly. Phase 1 drill hole locations showing in (black) and planned drill holes in (red).

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/6502/61308_a57a7bd9341a390b_001full.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/6502/61308_a57a7bd9341a390b_002.jpg

Figure 2. Cross section showing hole LK20-006.

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/6502/61308_a57a7bd9341a390b_002full.jpg

Table 1. Phase 1 Drill Results

Zone Hole From (m) To (m) Width (m) Pd_Eq g/t* PGE g/t (Pd+Pt+Au) Pd g/t Pt g/t Au g/t Cu % Ni %
Kaukua LK20-001 33.4 66.0 32.6 2.86 1.82 1.22 0.46 0.14 0.23 0.16
  Inc. 45.0 61.0 16.0 3.64 2.43 1.67 0.59 0.18 0.27 0.18
  Inc. 48.6 49.9 1.3 5.70 3.96 2.78 0.93 0.25 0.41 0.25
Kaukua LK20-002 38.4 71.0 32.7 2.00 1.06 0.70 0.29 0.07 0.15 0.16
  Inc. 43.0 53.1 10.1 3.08 1.65 1.07 0.47 0.11 0.26 0.24
  Inc. 45.8 47.3 1.5 5.23 2.85 1.82 0.82 0.21 0.49 0.37
Kaukua LK20-003 37.0 75.0 38.0 1.49 0.77 0.52 0.19 0.06 0.10 0.13
  Inc. 37.0 57.3 20.3 2.03 1.13 0.77 0.28 0.09 0.14 0.16
  Inc. 48.0 49.2 1.2 4.07 2.53 1.75 0.60 0.19 0.29 0.25
Kaukua LK20-004 40.3 68.5 28.2 2.04 1.11 0.73 0.29 0.09 0.19 0.14
  Inc. 40.3 53.4 13.1 2.73 1.58 1.05 0.41 0.12 0.24 0.17
  Inc. 52.1 53.4 1.4 4.43 2.69 1.83 0.71 0.15 0.38 0.26
Kaukua LK20-005 32.8 69.5 36.8 1.95 1.13 0.74 0.31 0.08 0.16 0.13
  Inc. 32.8 41.0 8.3 3.40 2.00 1.38 0.52 0.11 0.29 0.21
  Inc. 36.2 37.7 1.5 4.83 2.87 2.01 0.70 0.16 0.39 0.31
Kaukua South LK20-006 
Zone**
43.8 210.5 166.7 1.16 0.58 0.39 0.14 0.05 0.09 0.10
  Upper Subzone 43.8 62.0 18.3 1.27 0.33 0.21 0.05 0.07 0.13 0.16
  Middle Subzone 95.0 158.4 63.4 1.88 1.06 0.72 0.26 0.08 0.13 0.14
  Inc. 95.0 116.5 21.6 2.36 1.25 0.83 0.31 0.11 0.18 0.19
  And 138.4 146.1 7.8 2.61 1.59 1.12 0.38 0.09 0.13 0.19
  Inc. 138.4 139.9 1.6 4.88 3.13 2.09 0.72 0.32 0.40 0.25
  Lower Subzone 188.5 210.5 22.0 1.50 0.87 0.60 0.20 0.07 0.11 0.10
  Inc. 188.5 198.8 10.4 2.22 1.26 0.85 0.29 0.11 0.18 0.15
  And 256.7 257.9 1.2 3.50 1.39 1.10 0.26 0.03 0.11 0.45
Kaukua LK20-007 200.1 241.7 41.6 2.16 1.18 0.83 0.28 0.07 0.16 0.17
  Inc. 205.9 213.8 7.8 3.26 2.18 1.53 0.53 0.13 0.21 0.17
  Inc. 207.4 208.9 1.5 4.47 2.70 1.72 0.61 0.38 0.42 0.24

 

*Palladium Equivalent "Pd_Eq" is calculated using metal prices (in USD) of $1,100/oz for palladium, $950/oz for platinum, $1,300/oz for gold, $6,614/t for copper and $15,432/t for nickel as used in the Company's 2019, 43-101 mineral resource estimate on the Kaukua Deposit (see press release September 9, 2019).
** Includes 16.25m of unsampled core given a zero grade.
***Reported widths are "drilled widths" true widths. Estimated to be approximately 90% of drilled width for holes LK20-001-005 & 007, true widths for hole LK20-006 are unknown at this time.
**** Grey Italicised values are previously released (see press release July 22 and 28 2020).

QA/QC

The Phase I drilling program was carried out under the supervision of Neil Pettigrew, M.Sc., P. Geo., Vice President of Exploration and a director of the Company.

Drill core samples were split using a rock saw by Company staff, with half retained in the core box and stored indoors in a secure facility, in Taivalkoski, Finland. The drill core samples were transported by courier from the Company's core handling facility in Taivalkoski, Finland, to ALS Global ("ALS") laboratory in Outokumpu, Finland. ALS, is an accredited lab and are ISO compliant (ISO 9001:2008, ISO/IEC 17025:2005). PGE analysis was performed using a 30 grams fire assay with an ICP-MS or ICP-AES finish. Multi-element analyses, including copper and nickel were analysed by four acid digestion using 0.25 grams with an ICP-AES finish.

Certified standards, blanks and crushed duplicates are placed in the sample stream at a rate of one QA/QC sample per 10 core samples. Results are analyzed for acceptance at the time of import. All standards associated with the results in this press release were determined to be acceptable within the defined limits of the standard used.

Qualified Person

The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Vice President of Exploration and a director of the Company and the Qualified Person as defined by National Instrument 43-101.

About Palladium One

Palladium One Mining Inc. is a palladium dominant, platinum-group-elements (PGE), copper, nickel exploration and development company. Its assets consist of the Lntinen Koillismaa ("LK") and Kostonjarvi ("KS") PGE-Cu-Ni projects, located in north-central Finland and the Tyko Ni-Cu-PGE and Disraeli PGE-Ni-Cu properties in Ontario, Canada. All projects are 100% owned and are of a district scale. LK is an advanced project targeting disseminated sulphide along 38 kilometers of favorable basal contact. The KS project is targeting massive sulphide within a 20,000-hectare land package covering a regional scale gravity and magnetic geophysical anomaly. Tyko is a 13,000-hectare project targeting disseminated and massive sulphide in a highly metamorphosed Archean terrain. Disraeli is a 3,100-hectare project targeting PGE-rich disseminated and massive sulphide in a highly productive Proterozoic mid-continent rift.

The Kaukua deposit of the LK project hosts a pit-constrained resource of 635,600 Pd_Eq ounces of Indicated Resources grading 1.80 g/t Pd_Eq* ("palladium equivalent") contained in 11 million tonnes (@ 0.81g/t Pd, 0.27g/t Pt, 0.09g/t Au, (1.17g/t PGE), 0.15% Cu & 0.09% Ni), and 525,800 Pd_Eq ounces of Inferred Resources grading 1.50 g/t Pd_Eq contained in 11 million tonnes (@ 0.64g/t Pd, 0.20g/t Pt, 0.08g/t Au (0.92g/t PGE), 0.13% Cu, & 0.08% Ni), (see press release September 9, 2019).

*Pd_Eq is calculated using the following metal prices (in USD) of $1,100/oz for Pd, $950/oz for Pt, $1,300/oz for Au, $6,614/t for Cu and $15,432/t for Ni.

ON BEHALF OF THE BOARD

"Derrick Weyrauch"
President & CEO, Director

For further information contact:
Derrick Weyrauch, President & CEO
Email: info@palladiumoneinc.com

<< Previous
Bullboard Posts
Next >>