TSXV:HULK.H - Post Discussion
Post by
Alexandchoy on Mar 31, 2021 3:22pm
HULK news about their facility looks great
HULK announces they are on schedule for construction of their 20K sq ft vertical aquaponics farming facility which will include production, warehouse, R&D, a test kitchen, production kitchen and office space. Surrey Facility is expected to be capable of producing 6.4 metric tonnes of annualized product = 6800% increase in annualized capacity.
Summer 2021 is going to be huge for HULK once the facility is done and production has started. I’m in this one long = believe in their mission, technology, and the foods they are prioritizing growing.
Be the first to comment on this post