Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Intchains Group Ltd V.ICG


Primary Symbol: ICG

Intchains Group Ltd is a provider of integrated solutions consisting of computing application specific integrated circuit (ASIC) chip products for blockchain applications and a corporate holder of cryptocurrencies based on Ether (ETH). The Company utilizes a fabless business model and specializes in the front-end and back-end of Integrated circuit (IC) design, the two components of the IC product development chain. The Company’s products include computing ASIC chip products consisting of ASIC chips, computing equipment incorporating ASIC chips, ancillary software and hardware, the products are mainly used in the blockchain industry. The Company had built a technology platform named Xihe. The Company has developed hardware models and several systems under the Xihe Platform, including a factory production test system, an after-sales data system, a computing server system and a batch management system.


NDAQ:ICG - Post by User

Post by Marine2on May 26, 2017 4:34pm
213 Views
Post# 26290391

Management’s Discussion and Analysis !

Management’s Discussion and Analysis !

Integra Gold Corp.

Management’s Discussion and Analysis

 

 

https://www.stockwatch.com/News/Sedardoc.pdf?docid=3835847

 

OUTLOOK

 

The recent drill results from Lamaque, and specifically Triangle, continue to demonstrate the excellent upside potential of the property. The Company expects another busy year of exploration in 2017 both at surface and underground, with approximately 100,000 m of surface drilling and 10,000 m of underground drilling planned. The focus of the 2017 program will remain the Triangle and No. 4 Plug deposits, with some drilling (approximately 10,000 m) to be performed on early stage targets generated from the Gold Rush Challenge throughout the Lamaque property as well as at the Lamaque Deep target. In addition to drilling the Company is continuing its underground exploration program at Triangle that will include collection of a bulk sample in one of its principal mineralized zones, the C2 structure. The program, for which underground ramping started in July 2016, is expected to be completed in the fourth quarter of 2017. Integra expects to start extracting the bulk sample in the summer of 2017. Results of the bulk sample are anticipated in Q4 2017.

 

Exploration

As of May 26, 2017, the Company had eight drill rigs turning with over 14,000m in drill assays currently pending. A total of 36,400 m in 177 drill holes has been completed at Lamaque (Triangle, No. 4 Plug, and Deep Lamaque targets) in 2017 to date.

 

The exploration ramp excavation performance is in line with budget target at 175m/month for single face and 205m/month for double face development operator. Cycling the development stages during 10 hours shift for a round of 3.5m long, is done about 75% of the time. The East ramp can be started with a third team of development when required. Development of the Alimak raise to the surface was completed.

 

The personnel to serve for a second team of development for level cross-cut and ore sub-level mining is mobilizing in May and will be fully operational in June. Various mobile equipment to support the second team has been ordered and will be available in June to support the second team.

 

Up to now in 2017, about 1,000m of exploration development headings were advanced, including approximately 500m directly for the ramp. On May 26, 2017, the west ramp reached elevation 5205, which is 115m below surface. There are 3 sub level extractions to be done to reach the ore at elevation 76m, 94m and 112m. Definition drilling at a 10m spacing has been completed at elevation 76m and 94m.

The Company also announced positive drill results from its drilling programs at Triangle and other targets subsequent to the end of the quarter.

 

Drill results include the following:

 

On April 11, 2017, Integra announced that it has commenced a 10,000m underground drill program at Triangle. The underground drill program has been designed to test the bulk sample target in the C2 structure at 10 m centers. Drill bays for this program are located at the 76 level and 94 level (vertical distance in m from surface) of the Triangle exploration ramp. The completion of the bulk sampling program are expected in the second half of 2017.

 

On April 18, 2017, Integra announced assay results from its drill program of the C2, C4 and C5 structures at Triangle. Results from the C2 structure included 108.39 g/t Au over 3.40 m and 15.66 g/t Au over 4.90 m.

 

 M2

<< Previous
Bullboard Posts
Next >>

USER FEEDBACK SURVEY ×

Be the voice that helps shape the content on site!

At Stockhouse, we’re committed to delivering content that matters to you. Your insights are key in shaping our strategy. Take a few minutes to share your feedback and help influence what you see on our site!

The Market Online in partnership with Stockhouse