Is the resource 28 ton or 5?Interested in ICM's potential but confused, Do ICM have 28 tonnes or 5? 5 is the number in the Technical Report on sedar
14.7 Estimate Results Mineral Resource estimate results at cutoffs of 400, 600, 800, 1,000, and 1,200 ppm are summarized in Table 14-2. T
his resource estimation includes data from all four drill holes. At a cutoff of 400 ppm, the results of the estimation were 5.37 billion kg Inferred lithium (5.37 million tonnes Lithium) in 5.574 billion tonnes of claystone. Five to 10 additional holes are recommended for resource conversion and development, with a goal of converting some of the Inferred mineral resource to the Indicated and/or Measured categories.