RE:Here is MBAC Itafos flagship property for anyone new The other 3 plants are running at nominal or above capacity, it is only the benifcation plant that is now on ramp up
Now producing in ramp up.
Itafós has a design capacity of
500,000 tonnes of
SSP per year
Mine Life of 19
years
The Itafós site includes a mine and industrial complex, including a mill facility, a beneficiation unit, a sulphuric acid plant, and a granulation plant, that produces fertilizers and other by-products for agricultural use. By 2015, the site is expected to be operating at full capacity and annually producing 500,000 tonnes of Single Super phosphate (SSP).
Today, the site includes a new:
|
|
|
|
|
MINE
|
BENEFICIATION
PLANT
|
SULPHURIC ACID
PLANT
|
ACIDULATION
PLANT
|
GRANULATION
PLANT
|
The Itafós Operations follows an open pit mining method. The plant is designed for phosphate ore size reduction and beneficiation at the complex to produce 330,000 tonnes of 28% P205concentrate per year. The Sulphuric acid unit has a design capacity of 220,000 tonnes per year and will be reacted with the P205 to produce the SSP product. About 50,000 tonnes of Sulphuric acid capacity is available for sale which is in excess to the requirement for producing the final product at 50,000 tonnes of Granulated Super Phosphate. The sulphuric acid plant will also generate about 6MW of electricity.
In March 2013, MBAC released an updated resource estimate which delineated a deposit containing 79.0 million tonnes of measured and indicated mineral resources and 12.7 Million tonnes of inferred resources. Only 25% of the land package has been explored for the resource estimate. Further phase 2 drilling of the land could support Itafós' production expansion.
The technical report also outlined the deposit’s proven and probable reserves:
NI-43-101 Updated Technical Report
Ore Source |
K tonnes |
P2O5 (%) |
Proven Reserve |
15,954 |
5.09 |
Probable Reserve |
48,857 |
5.07 |
Key Parameters of the Project |
Mine Life |
19 years |
Average ROM Grade |
5.56% P2O5 in first 10 years (5.08% P2O5 LOM) |
Strip Ratio |
2.9 LOM |
OPEX |
$139 US per tonne (first 5 years); $ 162 US per tonne (LOM) |
Read more at https://www.stockhouse.com/companies/bullboard/t.mbc/mbac-fertilizer-corp#2lLhEfUXD1wLHKgs.99