How do these drills look?4 /23 returned serious values, others widths small. Those parts of the mines are worn out.
90-58 =32 holes pending. With inconsistency in results, too early to estimate tonnage or Mine Plan.
Are these widths true? Can not say.
I would assume that it would be step out as being part of the 90 drill program and existing mine.