Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Century Lithium Corp. V.LCE

Alternate Symbol(s):  CYDVF

Century Lithium is an advanced stage lithium exploration company, focused on developing its 100%-owned Clayton Valley Lithium Project in Nevada, USA. The company’s world-class resource of lithium-bearing claystone is processed at its lithium extraction facility in Amargosa Valley, Nevada. Century Lithium is working towards completion of a Feasibility Study and subsequent permitting with the goal to become a domestic producer of high-purity lithium carbonate.


TSXV:LCE - Post by User

Bullboard Posts
Post by JustGroon Jun 11, 2018 8:06am
187 Views
Post# 28153141

Cypress Development Files Resource Estimate for Clayton Val

Cypress Development Files Resource Estimate for Clayton Val

Cypress Development Files Resource Estimate for Clayton Valley Lithium Project, Nevada

VANCOUVER, British Columbia, June 11, 2018 (GLOBE NEWSWIRE) -- Cypress Development Corp. (TSX-V:CYP) (OTCQB:CYDVF) (Frankfurt:C1Z1) (“Cypress” or the “Company”) is pleased to announce it has filed a National Instrument (NI) 43-101 Technical Report on SEDAR titled “Resource Estimate Clayton Valley Lithium Project". The Technical Report details the independent Mineral Resource Estimate for the Company’s 100%-owned lithium project in Nevada, as described in the Company’s press release of May 1, 2018.

Global Resource Engineering (GRE) of Denver, Colorado, prepared the Technical Report which is the first estimate of resources for Cypress’ property. The report carries an Effective Date of May 1, 2018 and Issue Date of June 5, 2018. The report includes recommendations for further work including a Preliminary Economic Assessment (PEA) which GRE expects to complete in the next two months. Terre A. Lane, J. Todd Harvey, Hamid Samari, and J. J. Brown of GRE are the Qualified Persons for the report.

Highlights:

  • Total Indicated Mineral Resource of 697 million tonnes at an average grade of 886 ppm Li, or 3.287 million tonnes of lithium carbonate equivalent (LCE).
     
  • Total Inferred Mineral Resource of 643 million tonnes at an average grade of 852 ppm Li, or 2.916 million tonnes of LCE.
     
  • The mineral resources are reported using a cut-off grade of 300 ppm Li and constrained to pit shell reflecting a $15/tonne operating cost, $10,000/tonne of LCE price and 80% net recovery to LCE.
     
  • Minor changes in the resource model occurred following the May 1, 2018 press release due to adjustments in model boundaries. The proportion of indicated to inferred tonnes increased somewhat while the net lithium tonnes in the model decreased slightly.
     
  • The resources are broken down into five units which are distinguished by stratigraphic position and color (Table 1). The middle three units are higher grade and estimated to average greater than 950 ppm Li, whereas the uppermost and lowermost units average less than 700 ppm Li.
     
  • GRE generated an initial pit outline capable of supporting several decades of mining at a production rate of 10,000 to 15,000 tpd (Table 2). The initial pit contains an indicated resource of 191 million tonnes averaging 988 ppm Li (1.007 million tonnes LCE), and an inferred resource of 25 million tonnes at 1,047 ppm Li, (0.142 million tonnes LCE). Selective mining of higher grade material, i.e. targeting the middle three units, will be an option considered in the PEA.
     
  • Metallurgical bench tests from three drill holes, two of which are within the initial pit area, indicate agitated tank leaching with sulfuric acid is a viable method for extracting lithium. Tests indicate leach times of under 8 hours with relatively low consumptions of acid and other reagents. Sulfuric acid is expected to be the major component in operating costs, and alternatives for acid supply will be considered in the PEA.
     
  • Five to ten drill holes in the initial pit area are recommended by GRE to convert resources into higher confidence categories and to obtain material for further metallurgical testing. This drilling is not required for the PEA but recommended to advance the project quickly. GRE additionally recommends proceeding with collecting environmental baseline data, and conducting hydrogeology and geotechnical studies.                       

Details of the Mineral Resource Estimate

GRE estimated the Mineral Resource using a database of 23 drill holes for 1,891 metres, drilled by Cypress during 2017 and 2018. The resource was calculated using a 2.5-dimensional (2.5D) gridded model (common for layered sedimentary deposits) of six mineralized stratigraphic units, which includes a thin surficial gravel unit, and verified using a 3-dimensional (3D) block model. The mineralized intercepts in the drill holes and a 3D interpretation of the geology and intercepts were done by Terre Lane and J.J. Brown of GRE, who are Qualified Persons under NI 43-101.

Clayton Valley Lithium Project 3D Drill Hole View:
https://www.cypressdevelopmentcorp.com/site/assets/files/3573/cyp_re_3d_dh_view.jpg

All samples for the project were assayed at ALS Chemex or Bureau Veritas, both ISO-9000 certified laboratories. The resulting assay intervals were composited for the entire sedimentary unit for the 2.5D gridded model and were composited to a 5m down-hole length for the 3D estimate. Grade capping of lithium values was not required. Model grades were interpolated in Techbase using an inverse distance squared algorithm. A tonnage factor of 1.7 tonnes per cubic meter was selected based upon general published values to represent the insitu density. Indicated Mineral Resources were defined as being within 300 meters of a drill hole, with the Inferred mineralization requiring 2 drill holes within a search ellipse of 1500 x 800 metres for each unit. The major axis was orientated north-south along valley. The sedimentary units were truncated at the Angel Island volcanic package and claim boundaries.

The mineral resources reported use a cut-off grade of 300 ppm Li, reflecting a $15/tonne operating cost for mining, processing and G&A. The costs reflect a 10,000 – 15,000 tonne per day mining operation in soft sedimentary material that does not require blasting. Cost assumptions for the cut-off grade include a delivered acid cost of $80/tonne and 100 kg acid per tonne of material processed. 

An overall lithium recovery of 80% was employed for the mineral resource based on the results from laboratory testing and confirmation leach testing at Hazen in Golden, Colorado under direction of Dr. Todd Harvey, who is Qualified Person in Metallurgy under NI 43-101 from GRE. The preliminary metallurgical examinations indicate that the claystone responds well to conventional weak acid leaching with no upstream size reduction required. Initial results indicate that lithium extractions of greater than 80% can be achieved. Expected leach conditions of 2 – 8 hours of leaching with 5% sulfuric acid at temperatures ranging between 50 and 80 °C are anticipated.

Clayton Valley Lithium Project Leach Kinetics:
https://www.cypressdevelopmentcorp.com/site/assets/files/3573/cyp_re_preliminary_leach_kinetics-1.jpg

The preliminary leach results indicate relatively high grade pregnant leach solution (PLS) can be produced containing Li, K, Na and limited deleterious elements and a conventional downstream lithium recovery circuit should be applicable to produce saleable lithium carbonate or lithium hydroxide.

Clayton Valley Lithium Project Conceptual Production Flowsheet:
https://cypressdevelopmentcorp.com/site/assets/files/3573/cyp_re_conceptual_flowsheets.jpg

GRE concludes Cypress’ Clayton Valley Lithium Project has the potential to be a major supplier of lithium products in the world, and additional work is warranted.

Table 1. Indicated and Inferred Resources

Lithology Tonne Grade-ppm Li-kg LCE-kt
Indicated        
Upper Tuff 58,700 707 41,500 221
Upper Olive 148,300 897 133,000 708
Main Blue 220,500 1,081 238,400 1,269
Lower Olive 132,200 851 112,500 599
Hard Bottom 136,900 673 92,100 490
Total 696,600 886 617,500 3,287
 Inferred      
Upper Tuff 65,300 689 45,000 240
Upper Olive 112,400 883 99,300 529
Main Blue 190,700 1,032 196,800 1,048
Lower Olive 149,400 833 124,400 662
Hard Bottom 125,000 657 82,100 437
Total 642,800 852 547,600 2,916

Note: ppm = parts per million, Li = lithium metal, LCE = lithium carbonate equivalent, 
kg = kilogram, kt = kilotonne

Clayton Valley Lithium Project Resource Cross Section:
https://www.cypressdevelopmentcorp.com/site/assets/files/3573/cyp_re_cross_section_2.jpg

Table 2. Resources within Initial Pit Outline

Lithology Tonne Grade-ppm Li-kg LCE-kt
Indicated        
Upper Tuff 22,600 686 15,500 83
Upper Olive 37,400 947 35,400 188
Main Blue 88,000 1,169 102,900 548
Lower Olive 24,500 922 22,600 120
Hard Bottom 18,900 672 12,700 68
Total 191,400 988 189,100 1,007
 Inferred      
Upper Tuff - - - -
Upper Olive 7,200 986 7,100 38
Main Blue 11,200 1,161 13,000 69
Lower Olive 7,000 929 6,500 35
Hard Bottom - - - -
Total 25,400 1,047 26,600 142

Clayton Valley Lithium Project Plan View of Preliminary Pit:
https://www.cypressdevelopmentcorp.com/site/assets/files/3573/cyp_re_plan_view_of_preliminary_pitsm.jpg

CIM definitions were followed for Mineral Resources. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources will be converted into Mineral Reserves.

Terre Lane, J.J. Brown, Hamid Samari and Dr. Todd Harvey, of GRE are the Qualified Persons as defined by National Instrument 43-101 and have approved of the technical information in this release.

About Cypress Development Corp.:

Cypress Development Corp. is a publicly traded exploration company focused on developing the Company's 100%-owned Clayton Valley lithium project in the State of Nevada, U.S.A.

Cypress' Clayton Valley Lithium Project is located immediately east of Albemarle's Silver Peak mine, North America's only lithium brine operation. Recent exploration by Cypress has discovered an extensive deposit of lithium-bearing claystone adjacent to the brine field. With mineralization tested by drilling over a seven-kilometer trend, the size of the deposit makes Clayton Valley a premier target that has the potential to impact the future of lithium production in North America.

Cypress Development Corp. has approx. 60.1 million shares issued and outstanding.

To find out more about Cypress Development Corp. (TSX-V:CYP), visit our website at www.cypressdevelopmentcorp.com.

CYPRESS DEVELOPMENT CORP.

“Dr. Bill Willoughby”
                                                            
WILLIAM WILLOUGHBY, PhD., PE
Chief Executive Officer

For further information contact myself or: 
Don Myers
Cypress Development Corp.
Director, Corporate Communications
Telephone: 604-639-3851
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@cypressdevelopmentcorp.com